KB05PB Clean Room LED Light Fixtures Aluminum Alloy Color
Temperature 6500K White
Frame 6063 aluminum straight edge / beveled edge, stainless steel
straight edge optional, bracket fixed installation, beautiful
appearance.
All models can be retrofitted with an emergency time of 90 minutes
/ 180 minutes.
Specifications
Model | Rated Power | Rated Voltage | Power Factor | Luminous Flux | CRI | Color Temperature | Size | Beads Type |
KB-Y20/SD05P | 20w | 220-240v | >0.95 | 1600lm | ≥80 | 3000-6500K | 600L*300W(mm) | 4014 |
KB-Y42/SD05P | 42w | 220-240v | >0.95 | 3300lm | ≥80 | 3000-6500K | 600L*600W(mm) | 4014 |
KB-Y32/SD05P | 32w | 220-240v | >0.95 | 2600lm | ≥80 | 3000-6500K | 900L*300W(mm) | 4014 |
KB-Y42/SD05P | 42w | 220-240v | >0.95 | 3300lm | ≥80 | 3000-6500K | 1200L*300W(mm) | 4014 |
Features
- Beautiful appearance, not easy to accumulate dust. Ultra-thin
design to improve space utilization.
- The internationally renowned original packaged LED chip has high
light efficiency and low light decay.
- High-efficiency heat-conducting aluminum substrate, high-quality
heat-dissipating frame, reasonable structure design, ensuring
stable light source performance and long service life.
- Side light guiding technology, soft light, anti-glare, effectively
prevent visual fatigue and damage.
- Products meet the requirements of 3C, CE, GS and other
certification standards.
- Strict implementation of photobiosafety standards, no blue light
hazard.
Installation Notes
Installation diagram
- According to the position shown in the figure, the power supply
opening is made at the position corresponding to the installation
of the ceiling and the lamp.
- Place the mounting bracket on the mounting template. After fixing
the template with a magnet or by hand at the position where the
ceiling is installed, use the flat head self-tapping screws to lock
the bracket and remove the template.
- Pass the lamp power cord socket through the pre-opened outlet hole.
- Align the snap hole on the back of the luminaire with the bracket
buckle and push it into place. You can hear the click.
- After confirming that the lamp is tightly locked, connect the
connecting wire on the lamp through the hole and the DC output wire
on the driving power supply, and the power is on.
- If you need to disassemble, use a flat screwdriver to gently insert
the lamp and the ceiling of the ceiling, and use a little force to
open it.
Our Service
- If you are building a new hospital, we can offer your solutions of
OT and medical gas pipeline system;
- Our sales team give you the quotation and answer your any questions
and doubts about products;
- You are welcome to visit our factory at any time;
- We will offer you the solutions of quality problems within 24hours;
- Our after-sales service:
1. Engineer goes to your hospital and provide on site customer
training and guide,
2. We send the free parts to you by courier and give you technical
guidance via online video,
3. We support you free training of products.
Warranty: 1-2years due to different products, and lifetime
maintaining.