Chongqing Huigong Machinery Manufacturing Co., Ltd. |
|
Manufacturer Direct Selling Construction Galvanized Steel Stop Water Plate
Description
Steel plate rubber water-stop is also called water-stop steel
sheet, which can be divided into according to steel materials:
normal steel plate water-stop, galvanized steel plate water-stop,
and stainless steel plate water-stop.
Usage: Tunnel, subway, DAMS, tunnels, water conservancy and
hydropower engineering construction joint, high-rise building
basements, underground parking and other major engineering
construction joints.
In the protection engineering, the application of the steel plate
water-stop can ensure the protection effect. Also, it is used in
small area projects which require high seepage resistance, such as
smelting plant's casting pit, electric furnace's foundation pit.
Steel Plate Typed Rubber Water Stops
Steel plate waterstop can be mainly divided into: general steel
plate waterstop, galvanized steel plate waterstop, stainless steel
plate waterstop, specifications for:
200*2,200*3,300*2,300*3,350*2,350*3,400*4,330*5, and other
specifications.And it also can be customized according to the
user's requirements. It can change seepage path and extend the infiltration routes. It is anti-corrosion, suitable for construction condition that contains corrosion water. It can guarantee the protecting effect of projects. |
Usage:
Tunnel, subway, Dams, tunnels, water conservancy and hydropower engineering construction joint, high-rise building basements, underground parking and other major engineering construction joints. |
Application:
--construction joint of tunnel, metro, dam, culvert and water
conservancy. --basement of high-rise building --underground parking etc. |
Types of rubber water stop
1. Common Rubber Water stop 2. Swellable Rubber Water stops /Hydrophilic Rubber Water stop belt 3. Rubber Water stop with Steel Side 4.PVC rubber waterstop |
FAQ
1. Q: Are you trading company or manufacturer?
A: We are original equipment manufacturer.
2. Q: How long is your delivery time?
A: It is according to the model and quantity.
Generally it is 3-5 days if the machines are in stock.
It will be 15-30 days if you want to customize the machines.
3. Q: What is your terms of payment?
A: We accept T/T, Western Union, Money Gram, Paypal, Alibaba Escrow etc.
Payment<=USD 5000, 100% in advance.
Payment>=USD 5000, 30% T/T in advance, balance before shipment.
Contact us:
contact person :Cecilia wu
Cell :+86 17830959737