Home Companies Wuhan Time Wave Network Technology Co., Ltd.

LoRaWAN Energy Meter IoT Wireless 3 Phase Electric Meter Wall Mounted

Wuhan Time Wave Network Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: 603,building1,Guanggudingchuanginternational,No.51GuangguAvenue,JiangxiaDistrict,Wuhan,HubeiProvince,China

Contact name:Evan

Inquir Now

Wuhan Time Wave Network Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

LoRaWAN Energy Meter IoT Wireless 3 Phase Electric Meter Wall Mounted

Country/Region china
City & Province wuhan hubei
InquireNow

Product Details

Three Phase LCD Digital Display Lora Wireless Lorawan IoT Smart Electric Energy Meter for Energy Measurement

 

  • Product Overview
DTZY2397 three-phase four wire charge control intelligent electric energy meter is a new generation of intelligent high-tech remote electric energy metering product. It is based on MCU+measurement chip technology. Large scale digital signal processing chip is adopted. It is designed and manufactured according to the relevant international (IEC) standards of electric energy meters and China's electric power standards. With LoRaWAN/CAT1/Bluetooth wireless communication modules, communication distance and networking problems are solved. It has the characteristics of high precision, low power consumption and good stability. An important part of the modernization of distribution management can be realized without complex cabling. It can be widely used in the measurement of three-phase AC power in cities, rural areas or factories and enterprises.
 
  • Functions and features
1. Metering positive active, negative active and ABC split phase active electric energy function. It can measure, store and display the ABC voltage, current, total and three-phase active power, total and three phase power factor, frequency and other operating parameters and status of the current watt hour meter. It has overload protection function.
2. Remote power off and transmission function: send power off command through RS485 and other communication interfaces to cut off the user's load circuit. Or send the power transmission command to connect the user load circuit.
3. Active upload/two-way transparent transmission function: actively transmit data to the corresponding platform through LoRaWAN/CAT1/Bluetooth (optional) wireless network. The default interval is 4 hours (settable).
 
  • Specifications & technical parameters

Qualification

Three-phase direct meter

Three-phase CT meter

Standards

                                   IEC62053-21, DL/T645-2007

Rated voltage

3×220/380V

3×220/380V

Operating voltage range

80%-115%

80%-115%

Rated flow limit Ib

5A

1.5A

Maximum current: Imax

100A

6A

Starting current

0.4% Ib

0.2% Ib

Power consumption

        Non communication state≤1.5W , In communication state≤3W

Power grid frequency

50Hz

50Hz

Frequency range

±2%

±2%

Active measurement accuracy

Class 1/B

Class 0.5, S/C

Reactive measurement accuracy

Class 2

Class 2

Active pulse constant

400(imp/kWh)

3200(imp/kWh)

Reactive pulse constant

400(imp/kWh)

3200(imp/kWh)

Clock precision

±0.5S/d(23℃)

±0.5S/d(23℃)

Normal operating temperature range

-40° C ~ +70° C

-40° C ~ +70° C

Extreme operating temperature range

-40° C ~ +70° C

-40° C ~ +70° C

Transportation and storage temperature range

-40° C ~ +70° C

-40° C ~ +70° C

Power dissipation

<1.5W ,10VA

<1.5W ,10VA

The time that the blackout clock preserves

>24h

>24h

The RS485 Interface

The Default is 2400bps.

1200bps,2400bps,4800bps and 9600bps were available

LoRaWAN frequency

CN470,RU864,IN865,EU868,US/AU915,KR920,AS923_1/2/3/4,

Custom Channels

 

 

  • Display Description

The meter is fully displayed after power on, and then displays the total active energy kWh and total power kW in turn.

Full display Total active power Total power

LCD full screen display 0.08kWh 0.0396kW

 

 

  • Wiring diagram

Universal current terminal wiring diagram

 
Wiring diagram of the three-phase four-wire mutual inductance table
 
Wiring diagram of three-phase four-wire straight through meter table

 

  • Installation

Live installation of wiring is strictly prohibited!

The electricity meter shall be installed indoors as far as possible. Special instrument box protection shall be used for outdoor installation. The installation bottom plate shall be fixed on the wall with strong fire resistance and not easy to vibration. There must be no corrosive gases in the surrounding air where the meter is installed. Avoid dust, salt spray, etc.

When using the electricity meter, the wiring must be conducted strictly according to the wiring diagram in the tail cover of the meter. It is recommended to use copper wire for the lead connected to the terminal seat. The screws of the fixed lead in the terminal seat should be tightened to avoid burning the electricity meter due to bad contact and heating.

Hot Products

Single Phase Electric Watt Hour Meter LCD kWh Energy Meter Type DDZY2397 (LoRaWAN) Single-phase IOT ...
Single Three Phase Electricity Meter IoT LoRaWAN Type DTZY2397 Type DDZY2397 (LoRaWAN) Single-phase ...
Remote meter reading single phase electricity meter with nb-iot module/smart electricity meter Type ...
Single Phase LCD Digital Display Lora Wireless Lorawan IoT Smart Electric Energy Meter for Energy ...
Three Phase LCD Digital Display Lora Wireless Lorawan IoT Smart Electric Energy Meter for Energy ...
TimeWave Three Phases Electric Meter IoT LoRaWAN Smart Measuring Device DDZY2397 Type DTZY2397 ...