Home Companies Wuhan Time Wave Network Technology Co., Ltd.

Single Phase 220V LoRaWAN Energy Meter Wireless Smart Iot Electricity Meter

Wuhan Time Wave Network Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: 603,building1,Guanggudingchuanginternational,No.51GuangguAvenue,JiangxiaDistrict,Wuhan,HubeiProvince,China

Contact name:Evan

Inquir Now

Wuhan Time Wave Network Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Single Phase 220V LoRaWAN Energy Meter Wireless Smart Iot Electricity Meter

Country/Region china
City & Province wuhan hubei
InquireNow

Product Details

Lorawan Single Phase 220V Energy Meter LCD Display Plastic Material Shell Wireless IoT Smart Electric Energy Meter

 

  • Product Overview
DDZY2397 single-phase charge control intelligent electric energy meter is a fully digital intelligent electric energy meter developed by our company. Adopt SOC high integration chip. In addition to the active electric energy metering function, it also has a variety of functions such as online power display, intelligent power theft prevention, overload control, remote centralized meter reading, etc. The data is transmitted to the
corresponding platform through LoRaWAN/CAT1/Bluetooth wireless network. It has the characteristics of high precision, low power consumption and good stability, and can be widely used in the measurement of single-phase AC power in urban, rural or factory enterprises.
 
  • Functions and features
1. Metering of positive and negative active electric energy. The electric energy shall be accumulated and stored separately for tip, peak, flat, valley and other periods and the total electric energy. It can store and display various electric quantities in the last 12 months.
2. It can measure, store and display the current voltage, current, power, power factor, frequency and other operating parameters and status of the electric energy meter. It has overload protection function.
3. There are two sets of rates (tip, peak, flat and valley) and time periods that can be programmed at will, and another set of rates and time periods can be used at the set time point. At least 2 time zones can be set for each set of rate periods throughout the year. At least 14 time periods can be set within 24 hours; The minimum interval between periods is 15 minutes. The time period can be set across zero points..
4. It has the functions of event recording such as zero clearing, programming, timing, power failure, switching on and switching off.
5. Remote power off and transmission function: send power off command through RS485 and other communication interfaces to cut off the user's load circuit. Or send the power transmission command to connect the user load circuit.
 
  • Specifications & technical parameters

Standards

IEC62053-21, IEC62052-11, DL/T645-2007 220

Current(A)

5(60)A/0.25~0.5(60)A

Pulse constant(imp/kWh)

3200

Active measurement accuracy

Class B/1

Reactive measurement accuracy

Class 2

Frequency

50Hz

Power consumption

≤1.5W

Specified range

0.9Un ~ 1.1Un

Expansion range

0.8Un ~ 1.15Un

Limit range

0.6Un ~ 1.2Un

Specified temperature range

≤±1s/d

Reference temperature(23℃)

≤±0.5s/d

Active power(Class 1)

≤0.004lb

Reactive power(Class 2)

≤0.005lb

Specified working range

-25℃~+60℃

Operating limit range

-40℃~+70℃

Storage and transportation

-40℃~+70℃

Annual average relative humidity

< 75%RH

Natural distribution within 30 days of a year

95%RH

Occurs occasionally in other days

85%RH

LoRaWAN frequency

CN470,RU864,IN865,EU868,US/AU915,KR920,AS923.1/2/3/4,

Custom Channels

 

  • Wiring diagram

Among them, 5 and 6 are reactive pulse output (empty). 7 and 8 are active pulse output. 9 and 10 are clocks. 11 and 12 are RS485.

 

  • Overall dimension (unit: mm) L*W*H:158mm×112mm×58mm

  • Installation

    Live installation of wiring is strictly prohibited!

    The electricity meter shall be installed indoors as far as possible. Special instrument box protection shall be used for outdoor installation. The installation bottom plate shall be fixed on the wall with strong fire resistance and not easy to vibration. There must be no corrosive gases in the surrounding air where the meter is installed. Avoid dust, salt spray, etc.

    When using the electricity meter, the wiring must be conducted strictly according to the wiring diagram in the tail cover of the meter. It is recommended to use copper wire for the lead connected to the terminal seat. The screws of the fixed lead in the terminal seat should be tightened to avoid burning the electricity meter due to bad contact and heating.

Hot Products

TimeWave 220V LoRaWAN Single-phase smart IoT wireless high accuracy energy meter DDZY2397 TRANSPORTA...
Single Phase 4 Wire Wireless Lorawan/lora Energy Meter Remote Control Electric Meter Type DDZY2397 ...
Product Overview DDZY2397 single-phase charge control intelligent electric energy meter is a fully ...
Lorawan Single Phase 220V Energy Meter LCD Display Plastic Material Shell Wireless IoT Smart ...
Lorawan Wireless Three Phase Smart Electric Energy Power Meter LCD Display IoT Insulation Corrosion ...
DDZY2397 220V LoRaWAN Smart Meter Single Phase IoT Wireless Electricity Meter Type DDZY2397 (LoRaWAN...