Hunan Vict-Sailing Power New Energy Co.,LTD |
|
Rechargeable Lithium Batteries 3.2V 60Ah for Street LED Lighting , Long Life and Stability Safety
Why choose VICT ?
10 years lithium battery engineering and manufacturing. Fast Reply, 7 x 24 hours service. We promise to offer our customers high quality battery. Customer first culture: 80% of our customers are 5 years above long term partners. Our R&D colleagues are from the top 2 university and scientific institution of studying lithium chemical in china. Strict Quality Control: We set strict QC standards include appearance, package, internal structure, electric performance etc. Our production is under strict control of RoHS, providing environmentally-friendly products.
Parameter
Item | Rating | Note |
Battery Description | 3.2V 60Ah Li-LFP battery module | |
Cell Type | Li-LFP cell | 5 pieces of 3.2V 12Ah cells in parallel config |
Block Dimensions (L*W*H) | 71*75*147 mm(with top lid) | 71*75*144 mm (without top lid) |
Block Weight | 1.38 ± 0.05 kg | |
Rated Capacity | ≥ 60,000 mAh | (C/3 Discharge, 23°C ) |
Available Energy | ≥ 222 Wh | About 160 Wh/kg |
Charging Voltage | ≤ 3.65 ± 0.05 V | CC/CV charge mode |
Operating Voltage | 3.2V @ C/3, 23°C/73°F (3.0 V cut off) | Average working voltage |
Nominal Charge Current | ≤ 30 A (C/2 charge, 23°C/ 77°F) | Suggested charge current is ≤ 20 A, C/3 |
Nominal Discharge Current | ≤ 120 A @continuous (2C, 23°C) | |
Peak Discharge Current | ≤ 300 A @10sec (5C, 23°C) | |
Internal Resistance | ≤ 2 mΩ | AC internal resistance |
Operating Temperature | Charge: 0°C ~ 45°CDischarge: -10°C ~ 50°C | Suggested charging temp: 10°C ~ 35°CSuggested discharging temp: 0°C ~ 35°C |
Storage Temperature( ≥ 3 months) | 15°C ~ 30°C | Keep SOC at 40~60% for long term storage |
Product advantages:
Application
Packing
Pouch Cell Safe Test
Workshop
Battery Pack Installation & Maintenance (For Technical Reference only)
• Please study the related data-sheet and user manual before the
installation of battery pack, BMS
• Fix the battery installation location and install the battery
pack under ventilation cooling environment.
• Please be careful and prevent the battery from short circuit.
• All the cables should be the standard match that can resist the
related temperature and voltage.
• Please install/change the BMS under the instructions of operation
manuals and make sure every part is rightly
and tightly connected. BMS install requires the right sequence of
parts, please be aware.
• If the battery pack is separated, please pay attention to the
connecting steps and composition way.