Home Companies ZHUHAIJ-STAR LED MANUFACTORY LIMITED.

Auto Recovery 36W 24V LED Strip Light Power Supply IP33 Waterproof

ZHUHAIJ-STAR LED MANUFACTORY LIMITED.
Active Member

Contact Us

[China] country

Address: 2nd floor No 8 Quanyuan Roand Quanyan village zhongshan city Guangdong province China

Contact name:Lantos

Inquir Now

ZHUHAIJ-STAR LED MANUFACTORY LIMITED.

Auto Recovery 36W 24V LED Strip Light Power Supply IP33 Waterproof

Country/Region china
City & Province zhongshan guangdong
InquireNow

Product Details

Auto Recovery 36W 24V LED Strip Light Power Supply IP33 Waterproof
Led Tape Light Power Supply SAA Certified 36W 24V For Led Signs
 
 

Protection:

Open circuit Over load Short circuit Over temperature

Safety Standard:

Safety: IEC61347-1, IEC61347-2-13;
Harmonic: IEC61000-3-2
EMI: IEC55015;
EMS: IEC61547

 
Specification details:
 

ModelJSP-24036
Rated load power36W
Output Voltage24V
Output Current1.5A
Input Voltage range100-240V
Withstand2000V
PFC>0.7
DimmableNo
Dimension(mm)L140xW45xH28mm
Efficiency86%
Frequency50/60HZ
Ripple300mV Max
Electronic wire requestTeminal blocks
Over loading protection115%-125% hiccup mode, auto-recovery
Over heat protection<85°C hiccup mode, auto-recovery
Over voltage protection115%-125% hiccup mode, auto-recovery
Setup, rise, hold up time200ms, 100ms, 20ms
Isolation resistanceI/P-O/P, I/P-FG, O/P-FG:100M Ohms/500VDC
Working temperature and humidity-10℃~+60℃(Refer to output load derating curve),indoor or dry
Store temperature and humidity-20℃~+85℃, and dry condition
CertificationSAA CE ROHS
Warranty3 years
Input plug availableAUS PLUG, EU PLUG, US PLUG

 
1. If without specia explanation, all specifications are measured at an input of 220VAC, rated
load, ambient temperature of 25 ° C .
2. Ripple & Noise Measurement Method: Use a 12 '' twisted pair, and the terminals are
connected in parallel with 0.1uF and 47uF capacitors and tested at 20MHz bandwidth.
 
 
FAQ:
Q1. Can I have a sample order for products?
A: Sure, we welcome sample order to test and check quality. Mixed samples also acceptable.


Q2. What about the lead time?
A: Samples needs 1-3 days, mass production time needs 1-2 weeks

Q3. Do you have any MOQ limit for led light order?
A: 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5. How to precede an order for products?
A: 1, Let us know your requirements or application.
2, we quote according to your requirements or our suggestions.
3, Customer confirms the samples and places deposit for formal order.
4, Production arranged.

























Hot Products

ODM Slim Type 1.5A 24V LED Strip Power Supply With OPP Protection Slim Type 24v 1.5a 35wac To Dc ...
Constant Voltage LED Strips Power Supply 24VDC 2A 48 Watt LED Driver Constant Voltage power supply ...
12V 2A 24W LED Strip Light Transformer IP20 Constant Voltage For EMI Filter Led Strip 12v Power ...
SAA Certified IP33 5050 LED Strips Power Supply For Bathroom Mirror Power Supply For Led Strip 5050 ...
Auto Recovery 36W 24V LED Strip Light Power Supply IP33 Waterproof Led Tape Light Power Supply SAA ...
Plastic Shell 48W 12V LED Strips Power Supply Constant Voltage Constant Voltage Power Supply 48W 12V ...