Ningbo Zhaolong Optoelectronic Technology Co., Ltd |
|
Model | SBD11 |
Voltage | 120VAC 60HZ |
Plug | POWER PLUG |
LED power | 1W |
Product size(L:W:H) | 85x70x35mm |
Light source | With 2pcs white LED |
Case pack | 12pcs/inner box; 72pcs/carton |
Size of inner box | 32.5x13.5x17cm |
Size of carton | 42.5x34x36cm |
The weight | N.W.: 4.9 kgs G.W.: 6 kgs |
Packing | Each in a single blister card |
Material | ABS flame retardant & PC, PS. |
OEM | Available |
Certificate | GS/CE/ROHS/UL/CUL |
Normal packing standard | 36000PCS/20' 77472PCS/40' |
1. Input Voltage/Frequency
Input Voltage/Frequency:120VAC 60Hz ±10%
power consumption:≤1.2WRechargeable Ni-mH battery, 3pcs of AAA, 400mAH, total 1200MAH;
2. LED life time/ Lumen maintenance
LED working life:≤50,000h
LED photodegradation 5%/ 5,000h
Flash light: Super white LED, 3pcs;
Night light: white LED, 3pcs;
3. Charging Illustration
A. CDS no detect signal,PIR no detect singal,fully charging time 12±0.5h;
B. CDS detect signal,PIR no detect singal,,fully charging time 37±0.5h;
C. CDS detect signal,PIR detect singal,(Flashlight -motion working), charging circuit is not be active.
D.CDS detect no signal,PIR no detect singal,but Flashlight turn to "ON", charging circuit is not be active.
4. Flashlight/Night light discharging time
A. Flashlight/Nightlight turn on together,Run time >4.5 hours;
B. Flashlight on, Night light OFF, Run time >7.0 hours;
C. Nightlight on, Flash Light Off, Run time >9.5hours.
5. PIR(Pyroelectric Infrared Radial Sensor) Illustration
PIR reaction angle ≤90°,reaction distance 3-5m,reaction time 50±10s
Remark:While using the function on PIR,Body moving frequency >=0.3Hz ,PIR will fail to detect.
our servers:
1. Competitive price & hight quality
2. We have a strong R&D team and provide OEM & ODM services
3. We have reliable suppliers can offer us the materials with better price and good quality.All our products have UL & CUL, or GS, CE, NOM certificates, compliance with ROHS
4. our email will reply within 1 hour in our working time.
FAQ
1. Delivery Time?
Generally 30days - 45days!
2. What's your MOQ?
Our MOQ is 5000pcs!
3. What's your materials on the products?
Our materials include ABS,PC !
4. Which is the port of shipment?
FOB NINGBO!
5. What's your terms of payment?
By 30% T/T in advance, balance against copy of B/L.