cap soluble wax investment casting
Custom cap soluble wax investment casting stainless steel
CF8M
Description
Why should use soluble wax way on the casting? If the inner
structure is too hard to use one tooling to produce, we have to use
soluble wax way. We will do two toolings, one tooling for the
soluble wax, and the other tooling for the whole casting. Firstly,
we will get the soluble wax mould from the sioluble wax tooling,
and then put this mould on the other tooling for the whole casting,
later get the whole mould. And at last, put the whole wax mould
into water, waiting for the soluble wax mould disappeared, we get
the wax mould of the whole casting for the next procedures.
Item | Description |
Product Name | cap soluble wax investment casting |
Working Process | Tooling make, wax mould, shell mould, pouring, cut and grind gate,
shoot blast, after treatment, testing, packaging |
Material | CF8M |
Surface Treatment | According to the requirement of customer |
Application(Products cope) | one use on the cap of the machine, the other use on the tube joint,
air pressing machine |
Quality Control | ISO9001, TS16949 |
Thickness | Only to raw casting, more than 4mm |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Service | 24-hour reply to customer's enquiry |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Sample confirmation | Before start mass production we will send the pre-production
samples to customer for confirmation.We will modify the mould until
customer satisfied. |
Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to
customer's requirements |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 |
Price: | Quoted per see the drawing or sample |
Delivery Time: | 20-25 working days after received PO |
Payment Terms: | T/T, L/C |
Supply Ability: | 10,000pcs per month |
FAQ:
Q: What is the lead time?
1. If we will start this project, we will start the tooling make
and samples, which will be about 40-45 days after we received the
PO.
2. If do the mass production, the lead time will be 20-25 working
days after receiving the PO.
GOOD SERVICE:
We will respond to you within 24 hours. We can manufacture
nonstandard parts according to your drawings. And we offer best
after sale service.
LOWER PRICE:
The price of our products is reasonable and competitive, and we can
discuss if you want.
PERFECT QUALITY:
We have strict quality control from producing to delivery. Our
company had strong technology support. We have cultivated a group
of managers who are familiar with product quality , good at modern
concept of management .
Strict inspection we do during operation
1. We have specialized QC testers to check the products quality
according to different customers.
2. We have IQC to check the dimensions and surface of the incoming
material.
3. We have PQC to inspect full-course during the processing
4. We have FQC to inspect all the plating products from outsides
and make the 100% inspection before the shipments
5. We are willing to provide with sample for quality and function
testing. We are a certified firm with TS16949. Our products are
excellent in quality and reasonable in price.