Home Companies SHANGHAI YANYE INDUSTRIAL EQUIPMENT CO.,LTD

Anti Corrosion Industrial Water Cooling Towers , Forced Cooling Tower Easy Installation

SHANGHAI YANYE INDUSTRIAL EQUIPMENT CO.,LTD
Active Member

Contact Us

[China] country

Contact name:

Inquir Now

SHANGHAI YANYE INDUSTRIAL EQUIPMENT CO.,LTD

Anti Corrosion Industrial Water Cooling Towers , Forced Cooling Tower Easy Installation

Country/Region china
InquireNow

Product Details

Closed Cooling tower BAC Cooling tower Evapco Cooling tower Marley cooling tower Cooling system water cooling :

 

2.2 Advantages for cooling towers

1) Closed loop
Preventing the impurities into the system to block the cooling tubes, soft water is adopted to avoid overheating caused by scaling to the water pipes.

2) Automatic temperature control
Automatic start/stop spraying system to achieve effective control on the temperature of cycled cooling water, the temperature of the cooling water can be controlled below 40 ℃. With this function, the water & energy cost is reduced to the lowest point with intelligent control to the number of working fans and start & stop of spray pump.

3) No need of water pool and cooling tower
Low cost, small space occupancy, easy installation and move with the welder.

4) Cooling system structure
Galvanized iron beam.

5) High efficiency heat exchange
Four side air inlet louvers supply sufficient amount of wind blowing through cooling coils taking most of the heat away, which effect is strengthened via spray cooling water running through the cooling coils

 

3.6 Application Conditions

 

  • Environment:

(1)Altitude lower than 3000m;

(2)Wet Bulb Temperature below 32℃, Anti-freeze required below 0℃ dry bulb temperature.

(3)Average value of daily maximum relative humidity during the wettest month at the operation site shall not exceed 90%.

(4)The most harmful atmospheric conditions are those with large existence of industrial smoke, chemical fumes, salt or heavy dust. Such airborne impurities are carried into the cooling tower and absorbed by the spray water to form a corrosive solution, in which cases special attention shall be paid to the water treatment system and cooling tower construction materials.

  • Installation:

(1) Site diagram is to be provided by the client.

(2) Requirement for the base:smooth concrete ground surface or slabs is; metal frame base is also acceptable.

(3) For better cooling performance, the cooling towers should be placed where exist good ventilation and sun light shelter (direct sunlight will considerably increase spray water temperature).

 

  • Storage:

The closed circuit cooling tower shall not be covered by plastic film for long term warehouse stock to avoid accelerating corrosion to PVC materials.

  1. Technical Specifications & Supply Scope

 

 

ItemFBN-300T Specifications
Heat Reject1635kw
Nominal Flow Rate300 m3/h
Work Flow Rate235 m3/h
Fan Power2×11kw
Wind Flow Rate2×120000m3/h
Spray Pump Power7.5kw
Spray Water Flow Rate172m3/h
Spray Pump Raise9.6m
Inlet/Outlet DiameterDN 200mm
Makeup ConnectionDN40 (Please specify adopted screw standards)
Bleed Line DiameterDN50 (Please specify adopted screw standards)
Net Weight5150kg
Operate Weight9500kg
Dimensions5100×2300×4950mm

Hot Products

Industrial Cooling Coil water Cooling Coil Heat exchange Cooling Coils Evapco Cooling tower Coils ...
Cooling tower parts Industrial Cooling tower parts Cooling tower parts Closed Cooling tower parts : ...
Cooling tower parts Industrial Cooling tower parts Cooling tower parts Closed Cooling tower parts : ...
Closed Cooling tower BAC Cooling tower Evapco Cooling tower Marley cooling tower Cooling system ...
Closed Cooling tower BAC Cooling tower Evapco Cooling tower Marley cooling tower Cooling system ...
Large Capacity Closed Cooling Tower , Induced Draft Counterflow Cooling Tower YanYe cooling ...