Home Companies Guangzhou Jin Lun Electric Equipment Co.,Ltd

High Cop Ground Source Heat Pump , High Water Temperature Geothermal Heat Pump

Guangzhou Jin Lun Electric Equipment  Co.,Ltd
Active Member

Contact Us

[China] country

Address: 4# Qidong Road, Huadong town, Huadu district, Guangzhou, China

Contact name:Alinna

Inquir Now

Guangzhou Jin Lun Electric Equipment Co.,Ltd

High Cop Ground Source Heat Pump , High Water Temperature Geothermal Heat Pump

Country/Region china
City & Province guangzhou guangdong
InquireNow

Product Details

high cop ground source geothermal heat pump monoblock heat pump water source MD30D

Technology Specification

 

 

Porduct Details 

 

Rated heating capacityKW12
Hot water supplyL/h260
Average heating input powerKW2.89
Rated heating input currentA13/6
Max outlet water temp80
COP 4
PowerV/Hz220V/380V/50
NoiseDb(a)50
DimensionW*D*Hmm657×557×765
Packing sizeW*D*Hmm737×637×915
Unit weightKG108
Refrigerant R417A/R407C
Working air temp range(-40℃)—45℃
compressorType Copeland
water source heat exchangerType Plate heat exchange
Pipe sizeDN25
Hot water side heat exchangeType Coil heat exchanger
Water flowL/H3300L/h
Water pressure downKpa35
Pipe sizeDN25
Max house heatingM2100

 

 

water source heat pump installation different situations:

Water source heat pumps can use groundwater, river water, tap water, industrial wastewater as a water source, and people can choose suitable water sources according to their most favorable conditions. If groundwater is used, people can drill wells according to local geology, and generally more wells than pumping wells, because pumping water is easier than recharging. Construction of other water source heat pump projects is relatively easy.

 

A. Payment service

1. T/T

2. L/C (for container order only)

 

B. Technical service

1. We calculate the capacity and recommend the best models.

2.We supply you the professional refrigeration technical support and electronic technical support for your installation, debugging and operation.

3. We supply the spare parts and technical support in and after the warranty time.

4. We supply the training course to your workers at our factory if you need.

5. We can offer site training to your workers in your place which is negotiable.

 

C. After-sales service

1. Technical support for your installation, operation and maintenance.

2. Standard warranty time: One years’warranty for heat pumps

You can also pay for extended warranty or we can renegotiate the longer warranty period.

3. Spare parts and technical support at most economic prices after the warranty.

 

FAQ

Q1. Can I have a sample order for Heat pump or Water tank?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q2. What about the lead time?

A:Sample needs 3-10days, mass production time depend on the products'quantity.

Q3.Do you offer guarantee for the products?

A: Yes, 12 months since the heat pump depart from the port of loading (Refer to the Bill of Lading).

 

Certificsate we have got :

  • ISO 9001, ISO 14000
  • Our company has been inspected and certificate by EMC
  • CE And EN14511, EN 14825-ERP for heat pump exported to europe
  • Energy label for all heat pump models sold to oversea market
  • Testing laboratory calibrated by CNAS

Our leading products

Air to water heat pump , DC inverter heat pump, High water temperature heat pumps

Monoblock house heating heat pumps ,Split heat pump ,Super low noise heat pump

Heat pump dryer ,Ground source heat pump , water to water heat pump , swimming pool heat pump

 

Packaging & Shipment

1> Meeting heat pump can sure delivery heat pump within 5~20 working days as we warehouse stock condition.

2> Heat pump with strong plywood pallet , strong plywood box for loading, make sure no problem happen during rude transporattion .

3> All spare parts of the heat pump water heater will together loading into package , one time finished shipment to buyer.

4> Take video of the heat pump for buyer before package to 100% sure buyer get product same as order, no any different.

5> Meeting heat pump offer 100% test online, 5% test in Lab by 24 hour for one lot order (if not new model)

Packaging Details :Standard export packing -with plywoods case packages,OEM is available for Factory price heat pump water heaters

Delivery Time :15 work days after arrival of down payment

 

 

 

 

 

Hot Products

3P ground source machine_MDS30D ground source heat pump _ Panasonic press 220V blue steel shell ...
5P water source three-effect machine_MDS50D water source triple heat pump_Ultra-low temperature ...
Technology Specification Meeting water source heat pump water to water heat pumps can work good at ...
Technology Specification Water source heat pump installation in different situations: Water source ...
high cop ground source geothermal heat pump monoblock heat pump water source MD30D Technology ...
Water source heat pump Product Description Applicable scope: The reservoir farms near the rivers and ...