Home Companies Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

ZYC180 Hydraulic Pile Driving Machine 8T Lifting Weight For Pile Foundation

Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.
Active Member

Contact Us

[China] country

Address: No,21,Yongyang Road, Liuyang Hi-tech Industrial Development Zone, Changsha, Hunan, China 410323

Contact name:ivy

Inquir Now

Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

ZYC180 Hydraulic Pile Driving Machine 8T Lifting Weight For Pile Foundation

Country/Region china
City & Province changsha hunan
InquireNow

Product Details

ZYC180 Hydraulic Pile Driving Machine For Precast Concrete Pile Foundation

 

1. Description:

Hydraulic Static Pile Drivers are featured with no noise, no vibration, no pollution and no rubbish left in construction site.It can work with H-piles, precast concrete and steel piles with different shapes,like round,square and tapered shape. 

 

2. Applications: 

  • Clay, soft soil, sand layer, etc.
  • Noise regulated urban area.
  • Vibration regulated areas

3.  Specifications:

Parameter/ModelZYC180
Rate piling pressure(KN)1800
Piling speed(m/min)Fast11.0
Low2.7
Piling stroke(m)1.9
Pace(m)Longitudinal2.4
Horizontal0.6
Angle range(°)15
Rise stroke(m)1.6
Square pile(mm)Max500
Circle pile(mm)Max500
Side piling(mm)450
Corner piling space(mm)900
Lifting weight(t)8.0
Pile hanging length(m)12
Power(KW)Piling60
Lifting22
Main dimension(m)Work length9.9
Work width5.5
Transpot height3.0
Total weight(t)180

 

4. Features advantages :

  • No noise, no pollution
  • High pilling efficiency
  • Excellent piling quality
  • 14 patents in technology
  • Customer's Design and Logo are Welcome ,ODM Accepted,OEM Accepted

 

 

5. After sale service and quality gurantee

1) To train operating,maintenance and construction people for our customers.

2) Always be ready to answer technical questions concerned from our customers.

3) Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.

4) To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.

5) Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.
6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

 

 

 

Hot Products

ZYC Series Low Energy Consumption Hydraulic Piling Machine With 460T Piling Capacity Made By T-WORKS ...
High Piling Speed ZYC240 Hydraulic Piling Machine for T-works Static Pile Driver 1. Description: The ...
High Efficiency Hydraulic Jack In Piling Machine , Pile Foundation Equipment With No Noise And No ...
120T Concrete Hydraulic Rotary Piling Rig Spun Pile Square Pile No Vibration No Noise No Pollution 1...
120T High speed Hydraulic Rotary Piling Rig Spun Pile Square Pile No Vibration For Construction​tion ...
ZYC180 Hydraulic Pile Driving Machine For Precast Concrete Pile Foundation 1. Description: Hydraulic ...