Chongqing Bosun Electrical Co., Ltd. |
Verified Suppliers
|
|
MV switchgear production line lv switchgear panel lv panel board
Product knowledge
The connection method
Fastener connection
Process features: fixture setting, tooling positioning, and as required with pressure gasket; Generally, the riveting should be matched with drilling, and the pre-plated parts should prevent the coating from being destroyed; For the components processed by precision machining centers or special equipment, if the connection aperture and the diameter of the fastener can maintain a trace gap, it can be assembled without the fixture and formed once; The tightening of guiding and positioning parts should be first positioned with special measuring tools and then tested with standard tooling.
MV switchgear production line lv switchgear panel lv panel board
Parameter | Description |
Brand | Bosun |
Size(W*D*H) | Customizable |
Rated working voltage | Customizable |
Rated insulation voltage | Customizable |
Frequency | Customizable |
Rated current of main busbar | Customizable |
Rated current of distribution bus | Customizable |
Rated short-time withstand current of main bus | Customizable |
Rated short-time withstand current of distribution bus | Customizable |
Enclosure protection class | Customizable |
Chongqing Bosun Electrical Co., LTD., established in 1996, registered capital of 101.4 million. It is a high-speed development enterprise integrating research and development, manufacturing, installation and sales. Focus on the development of China's electric power industry, and strive to build a leading brand in the field of international electric power industry.
Q: How can I get a quotation?
A: Pls kindly supply single line diagram or details description( proposal) on demand products.
Q: How long get a quotation?
A: We will supply quotation within 24hours according to details description or single line diagram.
Q: What about after sale?
A: During warranty period , we will supply any technical service to solve problem.
Q: What about warranty?
A: 24month after the goods leave Ningbo/Shanghai port.