Home Companies Henan Tytion Machinery Co., Ltd.

Piston Cement Pressure Grouting Machine Single Cylinder Small Grout Pump

Henan Tytion Machinery Co., Ltd.
Active Member

Contact Us

[China] country

Address: MEIJI ROAD NO. 18, ZHONGYUAN DISTRICT, ZHENGZHOU CITY, HENAN PROVINCE, CHINA

Contact name:Jenny

Inquir Now

Henan Tytion Machinery Co., Ltd.

Piston Cement Pressure Grouting Machine Single Cylinder Small Grout Pump

Country/Region china
City & Province zhengzhou henan
Categories Pumps
InquireNow

Product Details

Single cylinder piston type Pressure Grouting Machine small type

 

Pressure Grouting Machine

 

Work Preparation of Pressure Grouting Machine:

After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check the sufficiency of lubricating oil in the gearbox (lubricating oil should be injected into the gearbox to the viewing hole of the oil window when it is first used).
2. Check the fastening and loosening of all parts, especially the screw tightening of rubber piston locking nut, cross head and tie rod. Whether the moving parts are blocked or not, and whether the rotation is flexible.
3. Check whether the filter, suction pipe and discharge pipe are unblocked.
4. Check whether the joints of the pipelines are firm and tight, whether there is leakage or leakage.

 

Technical parameters of Pressure Grouting Machine:

 

Cylinder number1
Bore diameter80mm
Piston stroke90mm
Diameter of suction pipe51mm
Diameter of outlet pipe32mm
Motor power5.5 kw
Main shaft speed1440 r/min
Working pressure5 Mpa

 

Structure of Pressure Grouting Pump:

 

Chemical Grout Injection Pump is mainly composed of pump body, pump frame, air chamber, shock-resistant pressure gauge, motor, V-belt and pulley cover.

The installation foundation of cement grouting pump should be smooth and not inclined.
The pump is fixed on the foundation with the foot screw to prevent the vibration of the pump during operation.

 

Preparations before pumping of Pressure Grouting Pump:


After the pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the pump. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.

 

Pictures of Pressure Grouting Pump:

Hot Products

Large Capacity continuous working Manual Grout Pump environmental Manual Grout Pump Main Features of ...
Variable Output New Condition Electric Cement Grouting Pump light weight Electric Cement Grouting ...
Variable frequency Nice Performance Cement Grout Injection Pump for tunnel Cement Grout Injection ...
Smooth Operation Foundation grout Chemical Grout Injection Pump large output Chemical Grout ...
Single cylinder piston type Pressure Grouting Machine small type Pressure Grouting Machine Work ...
Electric Drive Smooth Opeartion High Pressure Grout Injection Pump Use friendly High Pressure Grout ...