Jinan Darin Machinery Co., Ltd. |
|
Dog Food Soft Chewing Snacks Dog Food Cold Extruding Machine
Jerky Treats Forming Machine is specially used to produce high meat content products, and act as treats for dog and cat. Also, shaped biscuits, core filling treats can be produced by easily change the molds. The shape of jerky treats can be heart, cylinder, chips, strip, etc.
1, Specially used to produce 100% meat products;
2, Patented design to produce jerky treats with different shapes and sizes;
3, Controlled by PLC and touch screen with friendly interface and fault display function;
4, Core filling treats can be produced by changing the molds
.
Flow Chart:
Mixing materials - Forming treats - Cutting - Baking or Drying
Sample picture
1. Motors are from WEG, 1-year world-wide guarantee;
2. Electric parts are from Delixi easy to find replacments at
local market;
3. PLC and touch screen are from Siemens to realize easier
operation and less labor quantity;
4. While faults occurred, relevant information will be displayed on
touch screen, easy to settle the problem;
5. Control cabinet has 24V safe voltage (not 220V), which could
protect the operator even electric leakage occurred;
6. Three kinds of protectors to keep machine and operator safe:
over-current protector, over-voltage protector and over-heat
protector;
7. All the cover body, mesh belt and parts touching with materials
or final products are made by stainless steel.
Technical Parameters
Model | DR-126 |
Capacity | 100-150kg/hr (Decided by product size and weight) |
Power | 11kw |
Dimension | 4300*900*2000mm |
Notice
1. This product is pet snack,just for pet
2. Daily rations can be adjusted based on the breed type,physical condition,using condition
3. Don’t feed for puppies less than 3 months
4. There have Oxygen absorber in bags,you can throw away as garbage after opening
Commissioning Service
1. We make accurate factory layout design according to customer’s
factory size; if the customer needed, we could make workshop design
with electricity power, water supply, gas power, material storage,
final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply
for the Visa to client’s country immediately; normally the vessel
needs 20-60 days to the required port, so we have enough time to
get the Visa. While the machines arrives your factory, our
engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and
adjust the processing line to realize normal production at shortest
time.
4. Our engineers have responsibility to train and teach the workers
how to operate, clean, maintain and repair all the machines, until
the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion
of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and
daily salary USD 60 are on client’s account.