Home Companies Dongguan Zehui machinery equipment co., ltd

130KW PE Foam Net Making Machine , EPE Bags Foam Manufacturing Equipment

Dongguan Zehui machinery equipment co., ltd

Contact Us

[China] country

Trade Verify

Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China

Contact name:Wang

Inquir Now

Dongguan Zehui machinery equipment co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

130KW PE Foam Net Making Machine , EPE Bags Foam Manufacturing Equipment

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Memory Mattress Sponge Horizontal Continuous Foam Making Machine for furniture mattress

 

Details specification:

 

Our Lines can use 100% recycle materials, such as recycled EPS and GPPS as well as virgin GPPS as raw materials. It can reduce the cost of XPS board very much. The lines from Europe only can use virgin materials. The prices of recycled materials are much cheaper than virgin materials. Our Lines are the environment friendly machinery.

 

The ZHF-2017 Horizontal Continuously foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.

 

We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.

 

Main specification

 

 Oven Length18m
 Foam Height1.0-1.25m
 Foam Width1.0-2.25m
 foam desity8-200kg/m³
 total power130KW
 inner coveyer length18m
 side board adjustable width0.98-2.3m
 conveyer belt speed0-8m/min
 fall plateseven section adjustable
 total output100-300kg/min
 machine dimensionL35× W4.2 ×H3.2m
 

Main technique specification:

 

DimensionTotal length 35m×Total width 4m×Total Height 3m
Foaming material Group13 groups, man-machine interface, both manual and automatically computer control
Foaming width980mm~2250mm
Foaming heightMax 1200mm
Foaming density8Kg/m³~100kg/m³
Foaming speed2000r/min~7000r/min
Max total output300kg/min
Material spraying way① The way of down sprayer head (upper, down, front, back can be adjusted)     ② the way of trough overflow pipe.
Controlling way of foaming

①PLC controlling, can continuously foaming two different formulas in one time

②All inverter controlling foaming and work in phase with the production line

③Oven declining board height and width can be adjusted by control box.

④Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw
 

How is the packing of the machine?

 

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

 

How many container will be needed for the whole set of machine?

 

For the standard 13 groups of Automatic continous foam machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.

 

 

Our Services

 

1. We will help to design the layout of the machine that put in your factory.

 

2. We will send 2-4 experience engineers to install and testing the machines.

 

3. We will teach your engineer how to operate the machine and how to maintain the machines.

 

4. We will give you the machine operation manual and the best formulation for target products that you are going to make.

 

5.We will help to buy the best raw material for making the foam if you needed.

 

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

The main part of the machine

 

 

 

automatic foaming machine line.pdf

Hot Products

High Rebond And Memory Foam Making Production Line Five Formular Continuous Product Description The ...
Continuous Foam Production Line / Foam Manufacturing Equipment For Mattress ZHMACH Horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress ZHMACH Horizontal Continuousl...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress ZHMACH Horizontal Continuous...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress The ZHMACH horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress Description of Foam ...