Home Companies Dongguan Zehui machinery equipment co., ltd

Full Automatic Continuous Polyurethane Foam Machine , Foam Mattress Making Machine

Dongguan Zehui machinery equipment co., ltd

Contact Us

[China] country

Trade Verify

Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China

Contact name:Wang

Inquir Now

Dongguan Zehui machinery equipment co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Full Automatic Continuous Polyurethane Foam Machine , Foam Mattress Making Machine

Country/Region china
City & Province dongguan guangdong
InquireNow

Product Details

 

Full Automatic Polyurethane Foam Machine , Foam Mattress Making Machine

 

 

Product Description

 

Full-automatic Continuouse Polyurethane Foam Making Machine is the automatic horizontal continously foaming machine that make the furniture foam like sofa and mattress. The standard machine was together with 13 kinds of raw material.

 

 

For the process of foaming:

 

Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process

 

 

Main specification

 

 Oven Length18m
 Foam Height1.0-1.25m
 Foam Width1.0-2.25m
 foam desity8-200kg/m³
 total power130KW
 inner coveyer length18m
 side board adjustable width0.98-2.3m
 conveyer belt speed0-8m/min
 fall plateseven section adjustable
 total output100-300kg/min
 machine dimensionL35× W4.2 ×H3.2m
 
 

Main technique specification:

 

DimensionTotal length 35m×Total width 4m×Total Height 3m
Foaming material Group13 groups, man-machine interface, both manual and automatically computer control
Foaming width980mm~2250mm
Foaming heightMax 1200mm
Foaming density8Kg/m³~100kg/m³
Foaming speed2000r/min~7000r/min
Max total output300kg/min
Material spraying way① The way of down sprayer head (upper, down, front, back can be adjusted)             ② the way of trough overflow pipe.
Controlling way of foaming

①PLC controlling, can continuously foaming two different formulas in one time

②All inverter controlling foaming and work in phase with the production line

③Oven declining board height and width can be adjusted by control box.

④Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw
 
 

Material pot types: (The work pressure in the pot is normal pressure)

 

TypeUseSpecificationQty
Big material tankPPG5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankPOP5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tankCaCo35m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankTDI5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tankFlame retardant2m³/δ3m stainless steel, with filter system1
Big material tankMC2m³/δ2mm stainless steel, with filter system1
Small material tankSi180L/δ1mm stainless steel1
Small material tankA-33180L/δ1mm stainless steel, with filter system1
Small material tankT9180L/δ1mm stainless steel, with filter system1
Small material tankH2O180L/δ1mm stainless steel1
Small material tankColor180L/δ1mm stainless1
Small material tankAnti-yellow180L/δ1mm stainless steel1
Small material tankBlack180L/δ1mm stainless steel1
Floor powder mixing tankPPG, POP, Powder1.5m³/δ3mmA3 steel plate, with filter system1
Filter tankPOP, Powder1.5m³/δ4mmA3 steel plate1

 

 

FAQ:

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

 

 

The main part of the machine

 

 

 

 

Hot Products

High Rebond And Memory Foam Making Production Line Five Formular Continuous Product Description The ...
Continuous Foam Production Line / Foam Manufacturing Equipment For Mattress ZHMACH Horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress ZHMACH Horizontal Continuousl...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress ZHMACH Horizontal Continuous...
Zehui Automatic Long Polyurethane Foam Making Machine Line For Mattress The ZHMACH horizontal ...
8~100kg/m3 Density Sponge Continuous Foam Production Line For Mattress Description of Foam ...