Home Companies E-Lite Semiconductor Inc.

IP66 200 Watt LED Shoebox Light For Parking Area Lighting With Meanwell Power

E-Lite Semiconductor Inc.
Active Member

Contact Us

[China] country

Address: NO.507 4th Gang Bei Road Modern Industrial Park North Chengdu,Sichuan,China

Contact name:Roger Wang

Inquir Now

E-Lite Semiconductor Inc.

IP66 200 Watt LED Shoebox Light For Parking Area Lighting With Meanwell Power

Country/Region china
City & Province chengdu sichuan
InquireNow

Product Details

IP66 200watt LED Shoebox Light for Parking Area Lighting with Meanwell Power​

 

 

Installation Caution :

 

1. Please turn off the power before installation and ensure that the installation site can support the weight of the fixture.
 
2. In order to prevent the lamp off, make sure the installation is correct.
 
3. Do not use in a corrosive gas.
 
4. Do not cover any material in the body.
 
5. For safety, please tangible take a good ground.
 
6. Decomposition of the product, modification, or improper construction .
 

Technical Features:


• Input Voltage: AC100-277V 50/60Hz
• Operation Voltage: DC36-42V
• Total harmonic distortion: THD<15%
• Power Factor: PF>0.90
• Color Index: Ra>70
• IP Rating: IP66
• Life Span: 50,000 hours

 

Wattage100W150W200W300W
Input VoltageAC 100~277 V/ AC 200~480 V
LED DriverSosen
LED ChipLumileds
Power Factor≥0.95
Efficacy180lm/W
Luminous Flux18,000 lm27,000 lm36,000 lm54,000 lm
CRI≥70
Lumen MaintenanceL70>150,000 Hrs ( Tm-21 Calculation )
Colour Temperature4500~5500K (2500~5500K Optional)
Beam Angle30×120° 40×100° 60×100° 60×120°
90° 110° 150°
70×135° 75×150° 80×150°
IP RatingIP66
Operating Temperature-30 to 60°C (-22 to 140°F)
Dimensions597x358x82mm711x362x85mm805x362x85mm966x365x224mm
Net Weight6.5 kg7.5 kg8.6 kg14.8 kg
CertificationETL DLC CB GS TUV CE ROHS SAA
Warranty5 years
MaterialAluminum Alloy

 

FAQ:

Q1. Can I have a sample order for led light?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q2. What about the lead time?

A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than

Q3. Do you have any MOQ limit for led light order?

A: Low MOQ, 2 pcs for sample checking is available

Q4. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.

Q5. How to proceed an order for led light?

Hot Products

200W Integrated Outdoor Solar LED Street Garden Power Light E-lite over 12 years manufacture for ...
300W Intelligent LED Street Light for Street Road Park Square Lighting Competitive advantages: 1. ...
Outdoor Project Lamps 50W 300W Aluminum IP66 Modular LED Street Lights Outdoor LED street light ...
Outdoor Stadium Square Park Area Garden Yard Building Billboard Lighting Installation Caution : 1. ...
IP66 200watt LED Shoebox Light for Parking Area Lighting with Meanwell Power​ Installation Caution : ...
2020 Hot Sale LED Area Shoebox Lighting for Us Market ETL DLC CB led street light housing​ ...