Home Companies Quanzhou sanzhong heavy industry co., ltd

R210 R220 Hyundai Excavator Track Links Assy 1082-00060 Long Service Life

Quanzhou sanzhong heavy industry co., ltd

Contact Us

[China] country

Trade Verify

Address: Xia Mei Zhen Zhang Keng Cun Jin He Da Dao, Nan'an City, Quanzhou City, Fujian Province

Contact name:

Inquir Now

Quanzhou sanzhong heavy industry co., ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

R210 R220 Hyundai Excavator Track Links Assy 1082-00060 Long Service Life

Country/Region china
City & Province quanzhou fujian
InquireNow

Product Details

Hyundai excavator R210 track link assy R220 undercarriage parts track chain 1082-00060

 

SZC TRACK LINKS FOR EXCAVATORS & BULLDOZERS

 

SZC supplies track links/tracks/chains from 90 pitch to 260 pitch inclusive. We have both bulldozer tracks and excavator tracks. We subject the bushings to a special heat treatment, which increases the service life of the track links. We forge the links, and subsequently process them on high-tech CNC machines. This guarantees a very high accuracy, this is unique in this price range. The carbon steel selected ensures that the steel of the track link does not become brittle through the heat treatment.

 

GREASED TRACK LINKS
Excavator track links may be sealed or unsealed, and may be greased. Almost all SZC track links are greased and sealed to guarantee a longer service life. The advantages of sealed track links are:

The seals prevent soil infiltration and keep the grease in the track links.
The pins are greased before pressing, so that they are resistant to weather influences and corrosion.
There is minimal play between the pin and the bushing, thus preventing premature wear.
This combination results in a 20% longer service life for the excavator track links.

 

More models please kindly contact us

Fit for BrandModel
KOMATS UPC20PC30PC35PC40PC45
PC60-1-3-5-6-7PC75PC100-3-5PC120-3-5PC150
PC200-1-3-5-6-7-8PC220-1-3-5-6PC240PC300-1-3-5-6-7PC350
PC400-3-5-6PC450PC650PC750PC800
ERPILLA RE55/E55BE70/E70BE110/E110BE120/E120BE180
E215E225DLCE235E240E300B
E307E306E305E311/E312E320/E200B
E322E324E325E330E339
E345E349E450  
HITACH IEX30EX40EX55EX60-1-2-3-5EX70
EX100-1-3EX120-1-3-5EX150EX200-1-2-3-5-8EX220
EX230EX270EX300-1-2-3-5-6EX400-1-2-3-5EX600
UH043UH052UH053UH07UH081
UH082UH083ZAXIS 60ZAXIS 200-3-6ZAXIS 240
ZAXIS 270ZAXIS 330ZAXIS 360ZAXIS 450ZAXIS 870
ZAXIS 110ZAXIS 120   
BULLDOZERD20D3D30D31D3L
D3CD37D3DD4CD40
D4DD4HD41D45D50/D5/D5B
D53/D57/D58D60/D65D6D/D6D6CD6H
D65=D85ESS-2D75D7G/D7R/D7H/D7D80/D85D85A-12
D8KD8N/R/L/TD9ND85EX-15D150
D155D275D355  
KATOHD80HD140HD250HD400(HD450)HD550
HD700(HD770)HD820(HD850)HD880HD900HD1023
HD1220HD1250HD1430HD2053 
SUMITOM OSH60SH70SH100SH120SH200
SH210SH220SH280SH300SH320
SH350SH360SH400SH450SH460
LS2800FJS340S430  
KOBELC OSK60SK70SK75SK07-N2SK07/2/7
SK100SK120-3-5-6SK125SK160SK200-1-3-5-6-8
SK210SK220-3-6SK230SK250SK260
SK300-3-6SK320SK330SK400SK480
DAEWOODH55DH60DH80DH130DH150
DH200DH220DH215DH220DH258
DH280DH300DH360DH370-9DH400
DH420DH500UH07K907C 
HYUNDA IR60R80R130-5-7R150R200
R200-5R210R210-7R215-7R220-5
R225-7R260-5R265R290R300-5
R305R320R385R420R450-3-5
VOLV OEC55BEC140BEC210EC240EC290B
EC290B PRIMEEC360EC460EC700 
KUBOTAKX35KX50KX85KX135KX155
KX161    
DOOSANDX60DX200DX300DX340 
LIEBHERRR914R916R926R934R944
R954R964R974  
YUCHAIYC35YC60YC85YC135 
CASECX55CX75CX135CX240CX360
 YM55YM75   
TAKEUCHITB150TB175   
LIUGONGLG150LG200LG220LG925LG936
SAN YSY65SY90SY130SY215SY335
SY365SY6385   
 XG60XG80XG120XG200XG330
XG370    
 SE210LCSE280LC   
Mitsubish iMS110/MS120MS180MS230MS280 

FAQ
1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory loed on Quanzhou Nanan Distric, and our sales department is in City centre of QuanZhou. The distance is 15Kms, 40 mins.

2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.

3. How about the payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.

4. What is your minimum order?
It depends on what you are buying. Normally, our minimum order is one 20’ full container and LCL container (less than a containerload) can be acceptable.

5. What is your delivery time?
FOB Xiamen or any Chinese port : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.

6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specifiion piece
carefully, monitoring every production process until packing is complete, to ensure product safety into container.
 
Whatsapp:+86 18905051013
www.excavatortracklinks.com

Hot Products

EX200-1 EX200-2 EX200-3 EX200-5 Track Link For Excavator Parts Made in China We can supply you all ...
Manufacture Heavy Duty Steel Excavator Track Link Assy Undercarriage Parts High Quality Track Chains ...
OEM/ Original Shantui/Hitachi/ Bulldozer SD13/SD16/SD22/D80/D85/D155/PC60/P100/PC100/PC200/PC220 ...
d7f undercarriage parts dozer d9r excavator track roller bottom roller carrier roller track link pin ...
Hyundai excavator R210 track link assy R220 undercarriage parts track chain 1082-00060 SZC TRACK ...
Excavator Track Link Assembly Stc216mA-6051.1 No. 11742855p for Sany Excavator Sy385 Product ...