Home Companies Guangzhou Haofeng Supply Chain Management Co., Ltd

Front track idler assy for mini excavator wheel bulldozer parts rubber idler js220 pc20 pc60 pc200 pc300 ex120-2 js220

Guangzhou Haofeng Supply Chain Management Co., Ltd

Contact Us

[China] country

Trade Verify

Address: Room 601, Building 1, No. 2 Haipan Street, Nansha Street, Nansha District, Guangzhou City

Contact name:CHEN

Inquir Now

Guangzhou Haofeng Supply Chain Management Co., Ltd

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Front track idler assy for mini excavator wheel bulldozer parts rubber idler js220 pc20 pc60 pc200 pc300 ex120-2 js220

Country/Region china
City & Province guangzhou
Categories Plastic Additives
InquireNow

Product Details

Products Features

Material
35MnB
FinishSmooth
ColorsYellow/Black/Other
TechniqueForging / casting
Surface HardnessHRC52-58,deepth:8mm-12mm
Warranty time6 months
CertificationISO9001
Delivery TimeWithin 3 days after contract established

 

Undercarriage is adopting through hardening system and spraying quenching system while complying with the stringent ISO System. We are able to assure the part has excellent wear resistance even in the most severe working conditions.
 
We are using advance machining centre,horizontal and vertical CNC machining to execute processes such as machining, drilling,threading and milling to ensure the qulity and precision of each component to ensure the accuracy of assembly dimensions. This is to maximize the life span of each component and minimize production cost per hour.
 
 

Other machinery and models are available

 

IDLER 
PC20020Y-30-00030/KM-1642
CAT320113-2907/102-8151/CR5732
E3257Y0360
CAT330/E3361028152
CAT345115-6366/CR-6597
CAT385 EC700B/EC650CR6380/102-8136/135-8904/194-1157/248-7257/7Y-0856
ZX200/2409176864/9242964
SK200-324100N5948F2
EC290C14589914
EC290B1181-00721/14510972
EX200-59145269/ID-1816
PC300/360207-30-00160/KM-2018
PC400/PC450208-30-00201
PC650-8KM3060/21M-30-00301/21M-30-0030A
R29081EH-10050/81E8-2004/57407314/PV9544B0M00
R30581N8-13010 / V81N8-13010V
SH400KTA1268Z-C
VI030-1A172458-37061
PC35R-8 VIO40 VIO30 PC03 PC05 PC15MR PC10MR PC20MR PC30MR PC35R PC650-8 SK20SR SK40SR SK50UR
EX25-1 EX60-5 EX300-5 ZX330 ZAX360-5G EX400-1/ZX450 Short York ZAX450/ZAX470 Long York ZX870
 

Production Flow Processing and inspection

 

1. Material pretreatment: Preprocess the steel alloy or manganese steel materials required for the excavator wheel hub to remove impurities and impure substances to ensure the purity and plasticity of the material.


2. Heat treatment: The pretreated material is subjected to multiple steps such as high-temperature heating, insulation, and cooling. The structure and performance of the material are improved through the heat treatment process, and the strength and hardness of the wheel hub are increased.


3. Forging processing: The heat-treated material is forged into shape. After the material is heated, hammering, extrusion, stretching and other operations are performed, and the blank is finally forged into a precise wheel hub shape.


4. Machining: Process the forged wheel hub blank, including fine machining processes such as surface processing, holes, gears and splines.


5. Heat treatment again: The processed wheel hub is subjected to high-temperature heat treatment to make the wheel hub surface have high hardness and high strength, ensuring the reliability and durability of the wheel hub in high load and high-speed environments.


6. Spray painting: The manufactured wheel hubs are treated with protective coatings such as powder spraying to ensure the anti-corrosion and aesthetics of the wheel hub surface.

 

Company Strength

 

 

 

   Guangzhou Haofeng Scm Co., Ltd. is located in Nansha District, Guangzhou.Our company is a professional supplier of machinery parts, suitable for Caterpillar, Hitachi, Hyundai, Kobelco, Komatsu and other brands.We are committed to providing used excavator, excavator parts and Customized mechanical accessory. We have a large independent factory,100 employees, 15 sets of equipment and 4 production lines. We are both a supplier and manufacturer of mechanical engineering accessories.Our goods are delivered directly from the factory to customers with low price and good quality.

 

 

Customer Photos

 

 

Packaging And Shipping

 

We supervise the process from the factory to the port designated by the customer to ensure that the customer's products arrive at the destination accurately and safely.
 
1.By Bulk Shipment,the machine is placed on the deck.
2.By Ro Ro Shipment,the machine is placed in the cabin.
3.By Flat Rack Container Shipment.
 

FAQ

 

Q: Why should you buy from us not from other suppliers?

 

A:We have two companies and one factory, the price and quality are very advantageous. Our team has 20 years of experience in the machinery industry.

 

Q: How long is your delivery time?

 

A: Generally it is 10 days if the goods are in stock. or it is 20-30 days if not in stock. If it is customized,it will be confirmed accord ing to order.

 

Q: What about Quality Control?

 

A:We have excellent tester, check every piece to ensure the quality is good, and check the quantity is correct before the shipment.

 

Q: What is your terms of payment?

 

A: T/T 30% as deposit, and 70% before delivery,Terms Trade have CIF ,CFR,FOB,etc.

Hot Products

Customized Excavator attachments excavator rocke bucket crusher bucket yellow black bucket ...
#detail_decorate_root .magic-0{vertical-align:top}#detail_decorate_root .magic-1{vertical-align:top...
#detail_decorate_root .magic-0{vertical-align:top}#detail_decorate_root .magic-1{vertical-align:top...
#detail_decorate_root .magic-0{vertical-align:top}#detail_decorate_root .magic-1{vertical-align:top...
#detail_decorate_root .magic-0{vertical-align:top}#detail_decorate_root .magic-1{vertical-align:top...
#detail_decorate_root .magic-0{vertical-align:top}#detail_decorate_root .magic-1{vertical-align:top...