Home Companies Shanghai Beyond Machinery Co., Ltd

Plastic Pouch / Bottle Package Liquid Dairy Processing Plant 200ml 500ml 1000ml

Shanghai Beyond Machinery Co., Ltd
Active Member

Contact Us

[China] country

Address: No.680 Tingyi Road, Tinglin Industrial Park, Jinshan District, Shanghai, 201505, China

Contact name:Caroline Wang

Inquir Now

Shanghai Beyond Machinery Co., Ltd

Plastic Pouch / Bottle Package Liquid Dairy Processing Plant 200ml 500ml 1000ml

Country/Region china
City & Province shanghai shanghai
InquireNow

Product Details

 

200-1000ml plastic pouch or bottle package Pasteurized Milk Processing Line 12months warranty

 

Company introduction:

Shanghai Beyond Machinery Co., Ltd, established in the year of 2005, is a manufacture specialized technology-oriented machinery. BEYOND is able to provide the turn-key projects, including the design, manufacture, installation and commissioning for the production lines of liquid food such as dairy, drink, ice cream, fruit and vegetable, bio-engineering, chemical and pharmaceutical.

Cooperated with several domestic and abroad Light Industrial or scientific research institutions, we absorb their advanced technology and then take base to develop new even better process techniques, we are now specializing in all kind of sanitary stainless steel tanks, heater, cooler, sterilizer, concentrator, pump and other pipe and fittings.

 

Through the years of the common efforts of our staff, we have obtained high share in the market of machinery industry, and have developed ourselves into a medium-sized enterprise of certain popularity in the industry. Combining scientific research, technical development, production, marketing and after-sale service, we keep ourselves acting strictly in accordance with the quality assurance system of ISO 9001, to ensure us to provide the good quality equipments that are in accordance with the relative standards of Juice, Dairy, Pharmacy, bio-chemical, such as HACCP, QS and GMP etc.

 

Thank you very much for the trust of all our customers and we expect to build up good business cooperation friendship with more and more clients, and warmly welcome to your visiting to our factory!

 

 

 

Part 1. Basic technical parameters of this project

1. Product Variety: 5000L/H dairy production line.

2. Raw material: fresh milk(50%) and milk powder(50%)

3. Filling type: plastic pouch,1000ml/pouch;

 

 

Production line flow chart design:

 

 

Equipment list and quantity

No.Flow No.NameModelUnitQTY
1AMilk reception unit  
2A-1weighbridge PCS1
3A-2Electronic scale PCS1
4A-3Milk weighing tank500LPCS2
5A-4Milk reception tank1000LPCS1
6A-5Milk pump10T/HPCS2
7A-6Twin piping filter10T/HPCS1
8A-7Plate cooler10T/HPCS1
9A-8Blending tank10000LPCS2
10A-9Milk pump10T/HPCS1
11 Subtotal   
12BBlending unit  
13B-1Blending tank5000LPCS3
14B-2Milk pump10T/HPCS1
15B-3Milk pump10T/HPCS1
16B-4plate heat exchanger10T/HPCS1
17B-5powder-water mixer10T/HPCS1
18B-6Twin piping filter10T/HPCS1
19 Subtotal   
20CUHT sterilize and filling unit  
21C-1Tubular UHT6T/HPCS1
22C-2Degasser6T/HPCS1
23C-3High pressure homogenizer6T/HPCS1
24C-4Aseptic brick filling machine6000pack/hourPCS1
25 Subtotal   
26DWater Treatment system  
27DWater Treatment system5T/HPCS1
28 Subtotal   
29ESemi automatic CIP system  
30ESemi-automatic CIP system4×3TPCS1
31RCIP return pump20T/HPCS3
32 Subtotal   
33 Total price for equipment   
34FInstallation unit  
35F-1product piping system PCS1
36F-2power piping system PCS1
37F-3electrical distribution cabinets PCS1
38F-4electric installation material PCS1
39F-5installation and commissioning cost PCS1

 

Commercial terms

*Terms of Payment: 40% TT as down payment, the balance before loading,

or 100%L/C at sight against shipping documents ;

 

*Delivery time:

120 days after receive TT deposit or formal 100% L/C, upon approval on technical drawings and specifications by client.

 

*Duration of Guarantee:

 

1. within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.

 

2. After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.

 

3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and subsidary for each worker per day. And the local traffic, accommodation and lodging fees should also be available.

 

*Installation terms:

1. 50-60 days for installation and commissioning.

 

2. BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.

 

 

Hot Products

12 Months Warranty Dairy Processing Equipment from Milk Powder or Fresh Milk Features and advantages...
2000LPH SOY YOGHURT AND ICE CREAM PRODUCTION LINE Description: Shanghai beyond machinery co., ltd is ...
200-1000ml plastic pouch or bottle package Pasteurized Milk Processing Line 12months warranty ...
Photo show of Dairy processing machine milk blending system milk pasteurizer and homogenizer milk ...
1TPH - 10TPH ISO Standard Milk Pasteurizer Machine For Milk Pasteurization Plant FERMENTATION UNIT   ...
Specifications: Brand Name: Shanghai Beyond Model Number: BY-PM Capacity 5-300TPD Raw material Fresh ...