10 ton Single Girder Chinese Gantry Crane for Industrial Factory
Product Description
10 ton Single Girder Chinese Gantry Crane is a regular crane widely used at open ground and warehouses to
load or grab materials. There are two kinds of operation: ground or
air operation. The crane power supply can be through cable car and
cable drum reel, and customers can choose one of them.
Regular Maintenance
The working performance and service life of each mechanism of
lubricating bridge erecting machine depend on lubrication to a
great extent. When lubricated, the maintenance of mechanical and
electrical products, lubrication refer to their own manual, walking
cart, heavy truss truck should be a weekly note of grease.
Attention should be paid to wire breakage of the wire rope. If
there is broken wire, broken stock or wear to reach the scrapping
standard, should be replaced in time. Spreader spreader must be
inspected periodically. The pulley block of bridge erecting machine
mainly checks the wear condition of rope groove, whether the wheel
rim is cracked and whether the pulley is stuck on the shaft. Check
the rim and tread of the wheel regularly, and replace the wheel
when the rim is worn or cracked to 10% thickness. Bridge erection
machine brake should be checked once per shift. The brake should
move accurately and the pin shaft is not allowed to jam. The brake
shoe shall be properly fitted to the brake wheel and the shoe
clearance shall be equal when the brake is released.
- from the quality of the product workmanship to consider, a good
bridge erecting machine not only appearance meguiar's, and every
part is to keep improving. The processing process is complex, many
processes are used for finishing.
- also look at the service of manufacturer, large-scale
manufacturers, will generally provide installation and after-sale
services, training, etc. A set of, settled and small manufacturers
may not do so complete, when there is a problem in use process,
lead to cannot continue operation, slow speed of maintenance,
greatly delay the construction period, this is all need to
consider, some engineering can't delay, delay the whole project,
the cost may be.
- still have is the price also is the factor that we need to consider
when buying bridge erecting machine, but what need to remind a
buyer is, cannot consider the height of the price only, should look
according to its configuration price is appropriate.
Announcements
- The construction personnel must hold the relevant qualification
certificate, understand the relevant management system and the
relevant safety work regulations.
- When the gantry crane is dismantled, it shall be dismantled in
strict accordance with the work steps of the instruction. If the
staff finds that there is a change in the dismantling process, they
shall report to the chief engineer for approval before proceeding.
- The tools used to disassemble and install gantry cranes need to be
carefully inspected. The power tools of the staff must meet the
relevant product quality standards.
- Workers in the workshop must wear overalls during working hours,
and cannot wear shoes with plastic bottom or poor skid resistance.
- When working at height, all the equipment used should be tied with
a fall rope and a safety belt.
- In the process of dismantling, the staff must pay attention to
prevent scratching, trampling and so on.
- The crane binding work must find a person to be responsible for the
inspection, can not be ignored, to ensure that the foolproof.
- When the gantry crane is about to be hoisted, non-working personnel
must be cleared around the cargo to prevent unnecessary personal
injury.
- The hoisting wire rope must meet the requirements of not exceeding
the standard such as broken wire and wear.
- After the main girder is lifted, all employees must stick to their
posts and not leave without permission.
Parts Of Crane