Henan Dowell Crane Co., Ltd. |
|
200 ton Bridge Erecting Launching Double Girder Gantry Crane
Description:
200 ton Bridge Erecting Launching Double Girder Gantry Crane applies to highway, railway bridges to the construction site of
bridge construction, its main function is to mention prefabricated
good beam slice and delivered on prefabricated good piers.it and
general meaning cranes have very big different, high safety
requirements.
The capacity: 60-200ton
The span : 20-50m
Control Mode: Pendant, Remote Control and Cabin Control.
Technical parameters of bridge girder Launcher:
MCJH50/200 | MCJH40/160 | MCJH40/160 | MCJH35/100 | MCJH30/100 | |
Lifting capacity | 200t | 160t | 120t | 100t | 100t |
applicable span | ≤55m | ≤50m | ≤40m | ≤35m | ≤30m |
applicable skew bridge angle | 0-450 | 0-450 | 0-450 | 0-450 | 0-450 |
trolley lifting speed | 0.8m/min | 0.8m/min | 0.8m/min | 1.27m/min | 0.8m/min |
rolley longitudinal moving speed | 4.25m/min | 4.25m/min | 4.25m/min | 4.25m/min | 4.25m/min |
cart longitudinal moving speed | 4.25m/min | 4.25m/min | 4.25m/min | 4.25m/min | 4.25m/min |
cart transverse moving speed | 2.45m/min | 2.45m/min | 2.45m/min | 2.45m/min | 2.45m/min |
transportation capacity of bridge transport vehicle | 100t X2 | 80t X2 | 60t X2 | 50t X2 | 50t X2 |
heavy load speed of bridge transport vehicle | 8.5m/min | 8.5m/min | 8.5m/min | 8.5m/min | 8.5m/min |
bridge transport vehicle return speed | 17m/min | 17m/min | 17m/min | 17m/min | 17m/min |
Drawing of Bridge Erecting Launching Crane:
About Us
Dowellcrane Machinery Group is a China-leading group of crane
businesses which was founded in 1955, Only one company has 60years
manufacture experience. And serving a broad range of customers all
over the world to provide a complete set of advanced lifting
project, including Gantry crane, Bridge crane, Jib crane,
Accessory. Our clients include manufacturing and process
industries, shipyards, ports and so on. Regardless of your lifting
needs, dowellcrane Machinery Group is committed to providing you
with lifting equipment and services that increase the effectiveness
and value of your business.
Our Services
Packing and Delivery
Packing methods:
1. Electric parts are packed by high quality plywood crate, to
reduce distortion in conveying;
2. Main beams, end beams and electric hoist are packed by plastic
woven cloth. It can reduce abrasion when transport.
Delivery methods:
1. If the size of 150 ton concrete T beam launcher are suitable for
container ship, usually by container;
2. If the size is too big, usually by bulk ship or by container
after truncation; Transport ways are based on reducing cost for you
and keep the crane performance.
Delivery time:
Within 30 to 40 working days after the receipt of deposit.
Transportation:
generally 35 days to 50 days to destination port.