Wireless Remote Control Single Girder Overhead Crane 10 Ton For
Sale
Product Description
Wireless Remote Control Single Girder Overhead Crane 10 Ton is a
multi-action lifting machine that lifts heavy objects vertically
and horizontally within a certain range. This belongs to material
handling machinery. The working characteristic of crane is to do
intermittently movement, namely in a working cycle to take the
material, the migration, the unloading and so on movement
corresponding mechanism is to work alternately, the crane in the
market development and the use is more and more widespread.
Product Advantages
Quick response: promise to provide you with detailed quotation and product
information as soon as possible; Commitment to the shortest
possible time for you to customize the products you require.
Products and prices with high cost performance: our company has reduced the cost of the company through factory
procurement, large and quantitative procurement of various raw
materials and other measures, and ensured that the products are of
high quality and low price, and will effectively benefit the
advantages of our company's scale effect directly to customers.
Considerate service: all products sold by our company enjoy some paid service. Large
volume or long-term cooperation customers can become our company
VIP customers, enjoy more affordable prices and VIP service.
Product Maintenance
- lifting equipment before leaving the factory, to make
identity records. Safety inspection and maintenance before
equipment installation: check the integrity of the main mechanism
of the equipment, check the visible defects of the main steel
structure and joints, as well as the pin shaft and bolt, check the
anti-corrosion condition of the surface of the equipment, form
records and issue installation opinions.
- lifting equipment by special maintenance. After the equipment is
delivered for use, the operator of the equipment or the full-time
personnel of the user shall be responsible for the daily
maintenance. The installation and maintenance unit shall have the
obligation to supervise and inspect the daily maintenance. The main
contents of daily maintenance are summarized as "cross operation
method" : cleaning, fastening, lubrication, adjustment and
corrosion prevention. , at the end of the class 10 ~ 30 minutes a
day shift, patrol equipment parts, each part is normal, according
to the provisions of lubrication, mechanical operation of the note
is normal voice, do a good job cleaning and succession, equipment
appearance neat, in order to achieve the purpose of operating
normally, daily maintenance records and hand-over records to make
fixed form, and as the archives management.
- lifting equipment to carry out regular professional physical
examination. Regular inspection and maintenance during the use of
equipment: carry out several maintenance and repair of mechanical
equipment within the specified time, with cleaning, lubrication,
adjustment, disintegration and maintenance as the central content.
It is usually done by maintenance personnel and operation personnel
together. After the crane leaves the factory, it is generally
stipulated that there is about 60 hours' run-in period (some called
run-in period), which is stipulated by the manufacturing factory
according to the technical characteristics of the crane in its
early use. Run-in period is an important link to ensure the normal
operation of crane, reduce the failure rate and extend its service
life. However, some users ignore the special technical requirements
of the new crane during the run-in period due to the lack of common
sense of using the crane, or because of the tight construction
period, or because they want to gain profits as soon as possible.
Some users even think, anyway, manufacturers have the repair
period, the machine is broken by the manufacturer is responsible
for the maintenance, so the machine overload for a long time to be
put into use in the running-in period, cause the machine early
failure occurs frequently, which not only affect the normal use of
the machine, shorten the service life of the machine, but also
because the machine is damaged, affect the construction schedule.
Therefore, the use and maintenance of the crane should be paid full
attention to.
Parts Of Crane