Henan Perfect Handling Equipment Co., Ltd. |
|
Industrial Large Motorized Conducting Railways Powered Transfer Vehicle
Introductions
rail powered transfer vehicle get its power from railway. The 380V alternating-current is transformed into safe current 36V. The current collectors mounted on trolley get the 36V current from the railway and transmit it into electronic box and thus to make the car start, stop, move forward and move backward. Combined with PLC system, full automatic operation is available. It's widely used, life long, safe and flexible.
Advantage
Technical Table
Rated Load(t) | 2 | 10 | 20 | 30 | 40 | 50 | 63 | 80 | 100 | 150 |
Wheel Base(mm) | 1200 | 2600 | 2800 | 3200 | 3800 | 4200 | 4300 | 4700 | 4900 | 7000 |
Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | 1800 | 2000 | 2000 |
Wheel Quantity | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 |
Wheel Diameter(mm) | Ø270 | Ø300 | Ø350 | Ø400 | Ø500 | Ø500 | Ø600 | Ø600 | Ø600 | Ø600 |
Ground Clearance(mm) | 50 | 50 | 50 | 50 | 50 | 50 | 75 | 75 | 75 | 75 |
Running Speed(m/min) | 0-25 | 0-25 | 0-20 | 0-20 | 0-20 | 0-20 | 0-20 | 0-20 | 0-20 | 0-18 |
Motor Power(KN) | 0.8 | 1.5 | 2.5 | 4 | 5.5 | 5.5 | 7.5 | 7.5 | 11 | 15 |
Max Wheel Load(KN) | 14.4 | 42.6 | 77.7 | 110.4 | 142.8 | 174 | 221.4 | 278.4 | 343.8 | 265.2 |
Reference Weight(t) | 2.3 | 3.8 | 5.5 | 77.7 | 110.4 | 142.8 | 174 | 221.4 | 278.4 | 343.8 |
Production process
CNC Cutting
The steel plate is transported from warehouse to CNC cutting workshop for cutting.
Preliminary Assembling
Workers put the cut steel plate together according to the design drawing.
Welding
Weld the steel plate with automatic welding machine after the
preliminary assembling.
Post weld treatment
Test the welding section after the welding, polish and burring.
Post weld treatment to eliminate welding stress.
Spray Primer
Transport the structure part after processing to painting booth for
spraying primer. The main component of the primer is zinc rich
epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels,
motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the
integrity of primer. After that paint the finish.
Debugging
Debugging the cart after painting the finish with electric control
system, after the debugging, the cart will be tested without load and then with load. After the inspection, the cart will be transported to
storage area.