Henan Perfect Handling Equipment Co., Ltd. |
|
30T Metal Factory Using Rail Handling Wagon Equipment With Warning Light
Applications
Assembly Line: Due to advantage of without cable, it is mainly applied in assembly
line, can realize the straight rail, S shape rail, U shape rail, C
shape rail, Arc-shaped rail, 90 degree turn rail, crossing rail
etc.
Metallurgy industry: With the functions of steady traveling, stepless speed regulation,
the Steel Material Transporter is commonly applied to transfer
steel ladle, aluminum ladle, lead ladle, steel slag etc.
Warehouse transport: The Steel Material Transporter is applied to transfer heavy
material from one warehouse to another or from warehouse to factory
(eg.transfer paper coils in paper mill, transfer large package ),
it can travel in all kinds of rails. With automatically operate, it
can greatly improve the working efficiency.
Ship industry: Due to the large load capacity, the cart is applied in ship
industry to transfer workpieces, maintenance tools(propeller, motor
etc.).
The cart is also applied in dock or harbor to transfer cargoes and
containers. If needed, the hydraulic lifting device , weighing
device and automatic device can be added.
Workshop: The cart is mainly applied in machining workshop, manufacturing
workshop, mold workshop to transfer machining parts, finished
products, castings etc.
Painting room: The cart should be producing fire during working. In order to avoid
explosion, the motor, reducer, electric appliance, pendant and
alarm should protected and explosion-proof.
Main Features
Maybe you will have a consideration before buying a car, I
recommend you our products to you strongly for the following
reasons:
Low noise
It's powered by electric devices, so when you are operating it, you
can't feel much noise. It causes low noise level and give workers a
good working environment.
Maximum safety
We always try our best to make sure the safety of the operators and
the material handled. We do care the safety of everyone involved in
the job.
Easy for operation
Our vehicles are easy to drive, so as soon as you get it you will
be able to use it to transport your loads. We will support you to
make the best by using our products.
Parameters
Model | BXC-2t | BXC-20t | BXC-50t | BXC-100t | BXC-150t | |
Rated Load(t) | 2 | 20 | 50 | 100 | 150 | |
Table Size (mm) | Length(L) | 2000 | 4000 | 5500 | 6500 | 10000 |
Width(W) | 1500 | 2200 | 2500 | 2800 | 3000 | |
Height(H) | 450 | 550 | 650 | 900 | 1200 | |
Wheel Base(mm) | 1200 | 2800 | 4200 | 4900 | 7000 | |
Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 200 | 2000 | |
Wheel Diameter (mm) | 270 | 350 | 500 | 600 | 600 | |
Running Speed (m/min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-18 | |
Motor Power(kw) | 1 | 2.2 | 5 | 10 | 15 | |
Battery Capacity | 180 | 180 | 330 | 440 | 600 | |
Battery Voltage | 24 | 48 | 48 | 72 | 72 | |
Running Time When Full Load | 4.32 | 4 | 3.3 | 3.2 | 2.9 | |
Running Distance for One Charge(km) | 6.5 | 4.8 | 4 | 3.8 | 3.2 | |
Recommended Rail Model | P15 | P24 | P43 | QU100 | QU100 |
Sales Service
We have full confidence and high responsibilities in our products.
With quick quality information feedback system and technology
service team, we can provide with high quality service for you. Our
guarantee period is 12 months, after making sure the product is
working well. During this period, we can repair, change the machine
for you freely.
Productions
CNC Cutting
Transport the steel plate from raw material warehouse to CNC
cutting workshop for cutting. After the cutting, the workers will
do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the
preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring.
Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for
spraying primer. The main component of the primer is zinc rich
epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels,
motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the
integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control
system, after the debugging, the cart will test without load. And
after the no load test, the cart will be tested with load. After
the inspection, the cart will be transported to storage area.