Home Companies ChangSha Zoomwolf Machinery CO.,LTD

High Performance Boom Pressure Concrete Pump Boom Column Structure

ChangSha Zoomwolf Machinery CO.,LTD
Active Member

Contact Us

[China] country

Address: Yinpen South Road,Yuelu District,Changsha City,Hunan Province,China

Contact name:Ms.fu

Inquir Now

ChangSha Zoomwolf Machinery CO.,LTD

High Performance Boom Pressure Concrete Pump Boom Column Structure

Country/Region china
City & Province changsha hunan
Categories Pumps
InquireNow

Product Details

High Performance Boom Pressure Concrete Pump Boom Column Structure

 

Features
Optimal design of boom-&column-structure ,Inner hydraulic oil tank renders a compact placement.

The key components of hydraulic- and electrical-system are from world famous brand,which ensure safety and stability.

 

For option:
1. Standard types without counter weight
2. Floor or shaft climbing
3. Step speed or stepless speed(proportional control)
4. Column length:5m,8m,10m
5. Delivery pipes for option as project budget:
⑴ Ordinary single straight pipe and cast steel bend,service life not more than 20,000m3 ;
⑵ High wear resistance double straight pipe and bend,service life not less than 50,000m3;

 

 

Technical Specifications
Model of placing boomHGY29S-3RHGY29P-3RHGY29SC-3RHGY29PC-3R
PerformanceMax. radius (m)29
Free standing height,22.7m,400°
Slewing range
Working temperature(℃)0~60℃
Counter weight(kg)/2930
Total weight(kg)1910022030
Supply power to equipment380V/50Hz
Electric motorMotor modelY2-160L-4
Power(kW)15
Hydraulic systemSystem pressure(MPa)32
Flow(L/min)18
Oil tank capacity(L)280
Control mode(Cable+Radio) remote control
Clearing mode for concrete pipeWater clear / Dry clear
Section of tubular column (m×m)0.75×0.75
Arm(Booms)Boom modelfully hydraulic foldable arms
Delivery pipeline diameterDN125mm
Length of end hose (〃×m)5〃×3
The first sectionLength(m)10.9
 Articulation-2.5°~82.5°
The second sectionLength(m)9.6
 Articulation0°~180°
The third sectionLength(m)8.5
 Articulation0°~180°
ClimbingClimbing modeCylinder jack lifting
Internal climbing step distance(m)0.52
Floor FrameHole prepared in floor
Shaft FrameSize of climbing shaft : 2.0m-2.7m
Min. space between internal climbing frameClimbing(m)3
 Placing concrete(m)6
 Rest(m)6

 

 

About the model

HGY ×× S or P C or blank - × R

  ①   ②     ③        ④              ⑤

 

① Hydraulic concrete distributor

② Round number of Max.radius(m)

③ Step speed regulation(S)or

Proportional control speed regulation(P)

④ With(C)or without(blank) counter weight

⑤ Arm section number ×Roll folding(R)

 

Identification letter description

S: Step-speed adjustment

P: Proportional (Stepless speed regulation)

C: Counter weight

 

The sample

1. Model HGY33S-3R means:

Without counter weight,max.radius 33m,step speed regulation and 3 roll-folding arms.

2. Model HGY33PC-4R means:

With counter weight,max.radius 33m, proportional control speed regulation and 4 roll-folding arms.

 

 

Hot Products

Industrial climbing Concrete Pump Placing Boom Step Speed Or Stepless Speed Features Optimal design ...
Reliable Concrete Distributor Boom Clearing Mode For Concrete Pipe Features Optimal design of boom-...
High Strength Placing Boom Concrete Pump Fully Hydraulic Foldable Arms Features Optimal design of ...
Professional Concrete Distributor Boom / climbing Structure Structural characteristic of ZOOMWOLF ...
High Performance Boom Pressure Concrete Pump Boom Column Structure Features Optimal design of boom-...
380V / 50HZ Concrete Distributor Boom Tower Boom Pump Easy Installation Features Optimal design of ...