Home Companies Jiangsu Co-effort Mechanical&Electrical Technology Co., Ltd

55mm Diameter Stainless Steel V Band Clamp Roll Forming Machine

Jiangsu Co-effort Mechanical&Electrical Technology Co., Ltd
Active Member

Contact Us

[China] country

Address: B-613,Tempo Business Building , Yangshe Town, Zhangjiagang City, Jiangsu Province, China 215600

Contact name:Yvonne Ding

Inquir Now

Jiangsu Co-effort Mechanical&Electrical Technology Co., Ltd

55mm Diameter Stainless Steel V Band Clamp Roll Forming Machine

Country/Region china
City & Province jiangsu
Categories Clamps
InquireNow

Product Details

55mm Diameter Stainless Steel V Band Clamp Roll Forming Machine

 

 

Application of V Band Clamp Roll Forming Machine


This kind of roll forming machine can use all metal steel as raw material, through decoiler, straightening, roll forming and cutter processes, it can produce all kinds of clamps.

 
Procurement process
 
Customer provides v band clamps drawings and requirements --- We give customer our project and quotation --- Technical agreement discussion and price negotiation --- Contract signing --- We provide production schedule --- production time --- customer provide raw material ---- We produce samples --- profiler machine to test clamps ---- send to customer for check ---- approval ---- package and shipping
 

Technical Configuration 

 

NoItemsTechnical Requirements
1

Production Process

 

De-coiler --- Leveling --- Roll Forming --- Rolling Head --- Cut off
2Floor Area15×2.5×2(L×W×H)M
3Feeding DirectionFrom Right to Left
4Voltage415V,50Hz,3 Phase
5Air SupplyFlow Rate:0.5m³/min; Pressure: 0-0.7MPa
6Hydraulic Fluid46#
7Gear Oil150#
8Material of StripStainless Steel
9Width of Strip≤80mm
10

Thickness of Strip

≤2.8mm
11Speed15 components per minute for diameter 300mm
12Length Tolerance±0.5mm
13Total PowerAround 35 KW

 

Technical ParametersTypeGD100
Passes8
Driven MethodIndependent Gearbox
Forming Passes

Material 45#

High precision guide pillar bracket. Visual display is used to adjust the upper and lower rollers.

Passes Pitch200mm
Width of CoilMax. 80mm
Thickness of CoilMax. 3.0mm
Diameter of ShaftsΦ50mm Material: 42CrMo Hardening treatment

Material of Roller

 

Cr12Mov Hardness: HRC60-62°
Main Driven Servo Motor11KW+1.5KW
Rolling and Cutting Device1 set
Guide Device
 
Accurate introduction of the first forming wheel, with digital display, detection of head and tail of coils.
 
Lubrication system
 
The lubrication system for segment forming will be self-contained within the machine. The excess lubrication from the forming process will be re-circulated, filtered and re-used.
 

 

Control System

 

Any control cabinet which includes power supply, single or three phase power must be fitted with an isolator which only allows the cabinet to be opened when the isolator is switched to the off position.

The operator controls will be mounted in a location, which best suits, the safe operation of the machine. Controls that are essential to the operation of the machine must be placed outside the guarding.

All PLC programmes and any on-screen instructions must be in the English language.

At least one Emergency stop will be fitted at the operator position and others, as the machine design requires.

 

 

 

Equipment performance acceptance

 

1. Before the equipment is shipped, the designer and the buyer will send the technical personnel to the seller's equipment manufacturing site for equipment acceptance, acceptance according to the agreement and the relevant provisions of the state.

2. If there is any discrepancy or failure to meet the standard requirements of Equipment Acceptance, the seller should take measures to deal with until the requirements are met.

 

Equipment installation and debugging

 

1. After the arrival of the goods to the destination, the behalf of the buyer take pictures of the appearance of the goods and check the number of goods, if found inconsistent, please immediately notify the seller to confirm that, if the seller reason, the seller settlement, other reasons negotiation to resolve.

2. Equipment to reach the destination, with the installation conditions, the buyer promptly notify the seller, the seller should be within 5 days to send qualified engineering and technical personnel to the buyer equipment installation site guidance equipment installation, is responsible for equipment commissioning.

3. The seller is responsible for the commissioning of the equipment and instructs the purchaser to try production until the equipment produces a qualified product of various specifications.

4. The hydraulic oil, gear oil, saw blade, cooling water tank, cable and material used in commissioning shall be provided by Buyer.

 

The Final Acceptance

 

1. After Equipment commissioning, trial production qualified, by the two sides on behalf of the final acceptance.

2. The final acceptance includes: product, equipment, appearance inspection and equipment technical information acceptance.

3. After the final acceptance of the equipment, the two sides together to complete fill out the equipment acceptance report.

 

Quality Guarantee

 

1. The seller to ensure that the design and manufacture of equipment to fully meet the relevant national standards and norms, is strictly prohibited to use the state announced the elimination of products and technologies.

2. Warranty period is 72 hours after the trial and 12 months after acceptance. During the warranty period stipulated in the contract, all equipment damage caused by the design, manufacture and installation of the equipment shall be replaced by the seller free of charge.

3. The seller guarantees that all purchased parts are all excellent products, during the warranty period, where the quality of outsourcing products, performance, after-sales service and other issues, the seller to provide free services.

The supplier must strictly carry out the inspection and test of all production links in the factory to ensure that genuine quality inspection certificates, inspection records and test reports are provided as part of the quality certification documents at the time of delivery.

 
 

 

Hot Products

Full Automatic 304 Stainless Steel V Band Clamp Rolling Machine Application of V Band Clamp Rolling ...
Servo Control Metal Steel V Band Clamp Roll Forming Machine Application of V Band Clamp Roll Forming ...
High Speed Stainless Steel V Band Clamp Roll Forming Machine Application of V Band Clamp Roll ...
Stainless Steel V Band Clamp Roll Forming Machine Application of V Band Clamp Roll Forming Machine ...
55mm Diameter Stainless Steel V Band Clamp Roll Forming Machine Application of V Band Clamp Roll ...
Automatic Steel Coil 2 IN 1 RACK Decoiler and Straightening Leveling Machine STANARD ACCESSORY OF ...