Home Companies Shijiazhuang Coal Mining Machinery Co., Ltd.

EBZ200T roadheader with 100m drilling rig for underground coal mine tunneling

Shijiazhuang Coal Mining Machinery Co., Ltd.
Active Member

Contact Us

[China] country

Address: 167 Yuxiang Street, Shijiazhuang, Hebei province, China

Contact name:Gina

Inquir Now

Shijiazhuang Coal Mining Machinery Co., Ltd.

EBZ200T roadheader with 100m drilling rig for underground coal mine tunneling

Country/Region china
City & Province shijiazhuang hebei
InquireNow

Product Details

EBZ200T roadheader with 100m drilling rig for underground coal mine tunneling

 

Cylinders
Becuse working circumstance of the roadheader is very tough, so the cylinder's quality will affact the working of the machine greatly. We select the top quality cylinders.

 

Report from the user
 
Model
 
EBZ200
Weight
t
58
Overall dimension
mm
10620*2690*1830
Total power
321kW
286
Power station
kW
110
Cutting power
kW
200/110
Cutter speed
rpm
46/23
Boom telesopic length
mm
650
Width of apron
mm
3600
Max. cutting height
mm
5270
Max. cutting width
mm
6630
Applicable hardness
MPa
80
Travelling speed
m/min
0-7.5
Width of track shoes
mm
650
Groud pressure
MPa
0.135
Loading type
 
Independent star wheel
Voltage
V
660/1140
Applied tunnel gradient
°
±18
Convert valve for roof bolter
 
Optional
Dimensions of max part
mm
3130*1400*1600
Weight of the max. part
kg
6000
Hole depth
m
100
Hole dia.
mm
133-94
Our new type roadheader with exploration function makes a new record On August 27th, good news came from China Coal Xinji Energy Co., Ltd., which used the new type roadheader with exploration function independently developed by our company to carry out rock tunneling operations, and achieved an average daily progress of 10.2 meters and a maximum monthly 325 meters. The good results have set a new record for the mine.
The EBZ200T combines two functions of advanced detection and roadway excavation, which can effectively avoid geological disasters such as gas outburst and water seepage.
Before the tunneling operation, the geophysical excavation machine carried out advanced detection, detecting the drilling depth to 100 meters, the open dia. Is 133mm and the end dia. Is 94mm, from the opening to the completion of the hole, and the use time was about 12 hours, and its drilling speed, drilling quality and equipment stability were better than The crawler tunnel rig. The most important is it reduced the staggering time and space of the two kinds of equipment, improved the comprehensive tunneling efficiency, and won the praise of the users.

Hot Products

EBZ200T roadheader with 100m drilling rig for underground coal mine tunneling Cylinders Becuse ...
CMM2-22 Low Weight Hydraulic Rock Bolting Jumbo for coal mine Application The low-height hydraulic ...
Product Description structure features The whole vehicle is an integrated box, which is arranged as ...
SMJ1400 electro high pressure steam rinsing and washing cart Introduction it is with cool water, hot ...
Multi-function Roadway Repairing Machine with Drum Cutter Scissors Breaking Hammer The drum cutter ...
Multi-function Roadheader- Alpine Bolter Miner Introduction The alpine bolter miner is a comprehensi...