Installation requirements: Noumenon of entry panel should be bolted
on the wall, without any leakage. Adapter should be fixed by screws
first, or directly fixed on entry panel, and joints should be
sealed & soldered.
Signal switching among anechoic chamber, control room, and
amplifier room adopts the Wall penetration panels, its quantity and
layout depend on the test requirements. The connectors on the Wall
penetration panels are configured according to the requirements.
When takethe acceptance test on shielding effectiveness, all
outlets on the Wall penetration panels shall be closed or shorted.