Home Companies SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD

ISO Electric Cable Pulling Winch / Electric Cable Winch Puller For Tower Erection

SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD

Contact Us

[China] country

Trade Verify

Address: Tanjietang,Xinhe Village,Yetang,Shanghu Town,Chagnshu City,Jiangsu Province,China

Contact name:Judy

Inquir Now

SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

ISO Electric Cable Pulling Winch / Electric Cable Winch Puller For Tower Erection

Country/Region china
City & Province jiangsu
InquireNow

Product Details

ISO Electric Cable Pulling Winch / Electric Cable Winch Puller For Tower Erection

 

 

Application:

Powered winches are the construction tools of erecting electric circuits of high pressure electric transmission in the sky and laying electrical cables underground. They can complete the tasks of heavy-lifting and dragging such as erecting the wire. Testified by the experiments and practical uses, they have reasonable structure, small volume, light weight, strong power, nimble operation and convient transporting. Based on so many advantages, this Powered winch is popular with the electric workers.

 

Brake:

there are two kinds of brake installment in the machine-the auto clamp-brake and the clutch-drived chain brake.Both of them can play the brake function in clockwise and reverse-clockwise directions.

 

Hand installment:

if the prime motor doesn’t work well during the working process, you can use the hand installment to help you complete the job.

 

Lubrication

using the gasoline to lubricate the gearbox and using the butter to lubricate the outside bearing.

 

Operation methods

1. before turning on the machine,you must turn on the clutch first and put the racker for crosspiece-changing in the zero position

2. when moving the crosspiece,you should be quick.Otherwise the brake won’t work well.when turning on the machine,you shouldn’t work too fiercly

3. when changing the crosspiece position,you must turn on the clutch.Otherwise the gear will be damaged.After that,you should check whether the changing job is well done.Make sure you haven’t changed two crosspieces in one time.

4. If there is any difficulty during the process of changing crosspiece position,you shouldn’t try to complete the job forcrfully.Instead you should use the hand installment to help you complete the job.Concrete procedure:using the spanner to move the hand installment to a position with a certain angle,then you can change the crosspiece position smoothly.

 

Technical Data

Model NO.EngineGearPulling Speed(m/min)Rated Pulling Force(Ton)Weight(Kg)
JJM5DElectric motor 4KWSlow55150
Fast93
Reverse3NO Lifting

 

Hot Products

Fast Speed Belt Driven Electric Cable Winch Puller 2.2KW Rated Load For Tower Erection​ Winch ...
3 Ton Electric Cable Pulling Winch For Underground Cable Installation Project​ Application ...
ISO Electric Cable Pulling Winch / Electric Cable Winch Puller For Tower Erection Application: ...
Heavy Duty Electric Cable Pulling Winch 8 Ton 5.5KW Rated Load Two Brake Installment​ 1. Application...
220 Voltage Electric Cable Pulling Winch / Cable Drum Winch Stringing Equipment​ 1. Stringing ...
6M / Min DSJ-180 Underground Cable Pulling Winch Machine With Electric Engine 220V / 380V​ Quick ...