Home Companies TOBO STEEL GROUP CHINA

Asme B16.9 Schedule 40 Steel Pipe Fittings Threaded Tee Stainless Steel Equal Tee 304/316

TOBO STEEL GROUP CHINA

Contact Us

[China] country

Trade Verify

Address: 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China

Contact name:Joy Wang

Inquir Now

TOBO STEEL GROUP CHINA

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Asme B16.9 Schedule 40 Steel Pipe Fittings Threaded Tee Stainless Steel Equal Tee 304/316

Country/Region china
City & Province shanghai shanghai
Categories Worms
InquireNow

Product Details

Asme b16.9 schedule 40 steel Pipe Fittings Threaded Tee Stainless Steel Equal Tee 304/316

 

Product Description
UNS S08926
DIN W. NR. 1.4529
SPECIFICATIONS
Form
ASTM
Rod, bar and shape
B649
Plate, sheet and strip

 

A240, A480, B625, B906
Seamless and Welded pipe
B677, B829
Welded pipe
B673, B775, B804
Welded tube
B674, B751
Fitting
B366
Billet and bar for reforging
B472
PHYSICAL PROPERTIES
Density
8.10g/cm3
Melting Range
1320-1390℃
CHEMICAL COMPOSIION
%
MIN
MAX
Fe
BALANCE
Ni
24.0
26.0
Cr
19.0
21.0
Cu
0.50
1.50
Mo
6.0
7.0
Mn
-
2.00
Si
-
0.50
C
-
0.020
N
0.15
0.25
P
-
0.030
S
-
0.010
Details Images

FEATURES

Alloy 926 is a super austenitic stainless steel having excellent resistance to pitting and crevice corrosion in media containing haildes and hydrogen sulfide. It also has outstanding resistance to chloride-induced stress corrosion cracking, and resists to both oxidizing and reducing environments.

APPLICATIONS

Sour (containing hydrogen sulfide) crude oil and natural gas well components, flue gas desulfuruzation system components, marine engineering piping, and corrosive chemicals containers.
Recommend Products
FAQ
FAQ
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.

Q 5. what kind of certificates you have?
A1: We have been ISO9001:2008 and ISO14001:2004 certified by SGS since 2005.
A2: We have various rubber compounds approved by UL, FDA, NSF, KTW, W270, WRAS, ACS, AS4020, EN681, EN549, ROHS and REACH.

Hot Products

150lb-3000lb Loose Flanges Forged Fittings Stainless Steel Flange Pipe Fittings ASTM B16.5 Essential ...
90 Degree LR Elbow Stainless Steel Pipe Fittings Forged Fittings Threaded Tube Connector Product ...
Asme b16.9 schedule 40 steel Pipe Fittings Socket Weld Tee Stainless Steel Equal Tee 304 Product ...
Butt Weld Equal Tee Stainless Steel Class 600 900Industrial Pipe Fittings Ss304/316 Product ...
Asme b16.9 schedule 40 steel Pipe Fittings Threaded Tee Stainless Steel Equal Tee 304/316 Product ...
Stainless Steel Flange Forged Fittings Plate Flange Class 300# A182 Grade F 316 Overview Essential ...