Home Companies TOBO STEEL GROUP CHINA

Asme b16.9 schedule 40 steel Pipe Fittings Socket Weld Tee Stainless Steel Equal Tee 304

TOBO STEEL GROUP CHINA

Contact Us

[China] country

Trade Verify

Address: 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China

Contact name:Joy Wang

Inquir Now

TOBO STEEL GROUP CHINA

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Asme b16.9 schedule 40 steel Pipe Fittings Socket Weld Tee Stainless Steel Equal Tee 304

Country/Region china
City & Province shanghai shanghai
Categories Door & Window Bolts
InquireNow

Product Details

Asme b16.9 schedule 40 steel Pipe Fittings Socket Weld Tee Stainless Steel Equal Tee 304

 

Product Description
UNS S08926
DIN W. NR. 1.4529
SPECIFICATIONS
Form
ASTM
Rod, bar and shape
B649
Plate, sheet and strip

 

A240, A480, B625, B906
Seamless and Welded pipe
B677, B829
Welded pipe
B673, B775, B804
Welded tube
B674, B751
Fitting
B366
Billet and bar for reforging
B472
PHYSICAL PROPERTIES
Density
8.10g/cm3
Melting Range
1320-1390℃
CHEMICAL COMPOSIION
%
MIN
MAX
Fe
BALANCE
Ni
24.0
26.0
Cr
19.0
21.0
Cu
0.50
1.50
Mo
6.0
7.0
Mn
-
2.00
Si
-
0.50
C
-
0.020
N
0.15
0.25
P
-
0.030
S
-
0.010
Details Images

FEATURES

Alloy 926 is a super austenitic stainless steel having excellent resistance to pitting and crevice corrosion in media containing haildes and hydrogen sulfide. It also has outstanding resistance to chloride-induced stress corrosion cracking, and resists to both oxidizing and reducing environments.

APPLICATIONS

Sour (containing hydrogen sulfide) crude oil and natural gas well components, flue gas desulfuruzation system components, marine engineering piping, and corrosive chemicals containers.
Recommend Products
FAQ
FAQ
Q 1. What's the payment term?
A: We accept T/T 30% deposit and 70% balance against copy of B/L or L/C at sight, West Union,VISA,Paypal is also accepted.

Q 2. What is the normal lead time for product orders?
A: Average lead times for prototype / first article are 1-2 weeks, if tooling is involved, lead time for production tooling is 10
days, average production time after sample approval is 2-3 weeks.

Q 3. What is your standard packing?
A: All the goods will be packed by carton box and loaded with pallets. Special packing method can be accepted when needed.

Q 4. Could you please tell us the month capacity of your products ?
A: It depends on which model, we produce more than 2500 tons rubber materials per month.

Q 5. what kind of certificates you have?
A1: We have been ISO9001:2008 and ISO14001:2004 certified by SGS since 2005.
A2: We have various rubber compounds approved by UL, FDA, NSF, KTW, W270, WRAS, ACS, AS4020, EN681, EN549, ROHS and REACH.

Hot Products

A403 WP904L 2" Sch40s 90 Deg Long Radius Welding Pipe Fittings Stainless Steel Elbow Product ...
Copper Nickel Fittings C70600 CuNi90/10 Weldolet Sockolet Threadolet Application: Aviation, ...
Asme b16.9 schedule 40 steel Pipe Fittings Socket Weld Tee Stainless Steel Equal Tee 304 Product ...
Stainless Steel Butt Weld Fittings Pipe Tube Fittings Three Way Tee Reducing Tee Asme B16.9 Ss 304...
Stainless Steel Forged Fittings Pipe Tube Fittings Threaded Tee Reducing Tee Asme B16.9 Ss 304/316 ...
Butt Welded Elbow 90 Degree Stainless Steel Pipe Fittings 304 316L Stainless Steel Elbows Product ...