Home Companies GUANGZHOU TECHWAY MACHINERY CORPORATION

Horizontal Concrete Boom Pump , 11kw Hydraulic Placing Boom

GUANGZHOU TECHWAY MACHINERY CORPORATION

Contact Us

[China] country

Trade Verify

Address: Room 1311, Building NO.3 Golson Plaza, NO.163 Yingbin Ave,Huadu District, Guangzhou, 510800,China

Contact name:Zhang Chen

Inquir Now

GUANGZHOU TECHWAY MACHINERY CORPORATION

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Horizontal Concrete Boom Pump , 11kw Hydraulic Placing Boom

Country/Region china
City & Province guangzhou
InquireNow

Product Details

Floor Mounted Concrete Placing Boom / FHGY24 Floor fixed placing boom/ Stationary Concrete Placing Boom

 

Features:

1. Boom

The placing boom takes advantage of mature manufacturing platform of boom design of truck-mounted concrete boom. On the base of accuracy data, the boom structure is optimized through finite element analysis, modal analysis, dynamics simulation analysis and endurance test on model machine. The accuracy of design and data is assured through powerful test and industrial assess means. The same-class weld manufacturing technique is adopted for the boom, the quality is excellent.

2. Rotary table and slewing mechanism

The slewing support is a large-sized bearing which connects the boom and the column, and bears the overturning moment produced by the boom. It is a key component that directly affects the whole machine’s safety. The motor redactor is from Brevini in Italy and Dianamic in USA. It is in a high speed rate, and long life span and reliable. The hydraulic motor can rotate the slewing table and the boom 365°through the redactor.

3.Tubular column

The fortified tubular column is adopted. Deformation of the head of the tubular column is 20%~25% less than congener products, it improves the precision for pouring concrete and reduces vibration of the tube.

The connecting structure parts are optimized, and the rigidity of the column is well and the vibration becomes less

4. Climbing device

Two climbing modes are for choice: climbing device on floor and climbing device in elevator well. The climbing structure has been optimized and inclined block auxiliary structure is adopted in the tubular column. All can eliminate the error effectively for drilling holes in the floor.

 

 

Specifications:

 

 

Case Show:

 

Hot Products

Floor Mounted Concrete Placing Boom / FHGY21 Floor fixed placing boom/ Stationary Concrete Placing ...
Floor Mounted Concrete Placing Boom / FHGY24 Floor fixed placing boom/ Stationary Concrete Placing ...
Floor Mounted Concrete Placing Boom / FHGY28 Floor fixed placing boom/ Stationary Concrete Placing ...
Floor Mounted Concrete Placing Boom / FHGY32 Floor fixed placing boom/ Stationary Concrete Placing ...
HGY-13 Mobile Placing Boom for Concrete Distribution /Mini placing boom/13 M concrete placing boom...
HGY-17 Mobile Placing Boom for Concrete Distribution /Mini placing boom/17M concrete placing boom...