Home Companies Suzhou orl power engineering co ., ltd

Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

Suzhou orl power engineering co ., ltd
Active Member

Contact Us

[China] country

Contact name:Allen Liu

Inquir Now

Suzhou orl power engineering co ., ltd

Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

Country/Region china
Categories Boilers
InquireNow

Product Details

Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

 

 

Descriptions:


Steam header is a necessary device for steam boiler. It is mainly used for power generation, iron and steel industry, oil and chemical industry, cement industry, and construction industry, etc

 

The boiler headers have water wall header, superheater header, economizer header and so on. It acts as collection, mixture, re-distributing working medium. As the structure, it can be classified as the end cover type ( end enclosure) and necking down type.

 

Boiler headers, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

Boiler header, also called sub-drum,widely used in power generation, petrochemicals, steel, cement, construction and other industries.

Specification:

1. Steam header body diameter: 6inch ,8inch,10inch,12inch,and so on

2. Branch pipe:1',2',3',4',5',6' and so on.

3. pressure:1.0mpa,1.25mpa,1.6mpa,2.0mpa,2.5mpa

4. material:pressure vessel carbon steel.

Kindly tell us the steam header body size and branch size and branch pipe numbers when you want to order this product. Thank you.

Technical Parameter:

Body Materials

Carbon Steel(20#,20G,SA192,A-1),Alloy Steel(15CrMoG,12Cr1MoVG,T11,T22)etc.

 

Typeheader body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts
Advantagesadvanced welding, safe and reliable operation
Working PressureDepend on material
StandardChina GB, ASME
DimensionCustomization
WeldingSMAW, SAW,GTAW (TIG)
Manufacturing processMaterial→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Drilling→Welding→RT, PT→ Inspection →Heat treatment →Hydraulic pressure test→Painting→Packaging
RemarksCustomized order is also accepted.

 

 

 

Name&TypeSupply Ability:FOB Price
Boiler drum100Ton/Tons per MonthContact Me Get Latest Price
Boiler header100Ton/Tons per MonthContact Me Get Latest Price
Boiler waterwall panel500Ton/Tons per MonthContact Me Get Latest Price
Boiler economizer500Ton/Tons per MonthContact Me Get Latest Price
Boiler super heater300Ton/Tons per MonthContact Me Get Latest Price
Boiler air preheater300Ton/Tons per MonthContact Me Get Latest Price
Other300Ton/Tons per MonthContact Me Get Latest Price

 

 

Company Information

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

Product Description

 

Boiler Parts

 

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

 

Boiler Parts

 

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 

Production Workshop

 

Boiler Product Test

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

 

 

Packaging & Shipping

 

 

Certifications

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

Company Business 

Trading Process

 

 

FAQ

 

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

 

 

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

Contact Information

ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China

Phone:+86 0512-56770166

E-mail: info@orlpower.com

Website: www.orlpower.com

Hot Products

Bare Tubes Economizer Boiler Spare Parts For Industrial Boiler Accessories Website:www.orlpower.com ...
Industrial Steam Boiler Manifold Headers , CFB Boiler Header With Longitudinal Welded Pipe Website...
Power 15T Capacity 240 MW Plant CFB Boiler Heating Power 15T Capacity Chemical Oil Chemical Industry ...
Industrial Steam CFB Boiler Header / Low Loss Headers Low Pressure Descriptions: Steam header is a ...
Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure Descriptions: ...
CFB Heat Exchanger Boiler Ionic , Boiler Header ORL Power ASTM Certification Descriptions: Steam ...