Shanghai YIKU Power Equipment Co., Ltd |
Verified Suppliers
|
|
H200N2 Bearing housing shell
1.金加工后进行密封试验.试验压力为3×105/Pa.试验时间为15分钟,要求轴承箱体本体不渗漏
2.用五倍放大镜检查铸件加工表面,不允许有气孔.
3.铸件尺寸公差按GB6414-99中7级精度.
1. Seal test after gold processing. The test pressure is 3×105/Pa. The test time is 15 minutes, and the bearing housing body is required not to leak
2. Check the machining surface of the casting with a five-fold magnifying glass, and no pores are allowed.
3. Casting size tolerance according to GB6414-99 grade 7 accuracy.