Home Companies MOORE AUTOMATION LIMITED

E89110-B1891-L1 6RA2216-8DK27-0 Siemens Simoreg Combi Boiler

MOORE AUTOMATION LIMITED

Contact Us

[China] country

Trade Verify

Address: 32D floor ,GuoMao building , Hubin South Road, Siming District,Xiamen City,Fujian Province,China.

Contact name:Miya

Inquir Now

MOORE AUTOMATION LIMITED

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

E89110-B1891-L1 6RA2216-8DK27-0 Siemens Simoreg Combi Boiler

Country/Region china
City & Province xiamen fujian
InquireNow

Product Details

 

E89110-B1891-L1 6RA2216-8DK27-0 Siemens Simoreg Combi Boiler

 

⇒ Click here for good price E89110-B1891-L1

 

Brand/Manufacturer  SIEMENS /GERMANY
Part Number

  E89110-B1891-L1

Alternate Part Number  E89110-B1891-L1
Description  MOTOR SERVO
Dimennsions

  30x10x38cm 

Weight  1.25kg

 

Moore News

NONFERROUS INDUSTRY

Non-ferrous Industry Capability

 

The sintering method and the Bayer process are currently the main methods for industrial production of alumina.

Most of the alumina produced is produced by Bayer process.

The Bayer-sintering hybrid method was first created, which greatly improved the total recovery of alumina.

With the continuous improvement of production technology, some new production methods such as lime Bayer method and beneficiation Bayer method are continuously applied to production.

 

The integrated process control system is a distributed control system.

The system consists of eight process control subsystems (workshop) for raw material grinding, lime digestion, dissolution, sedimentation, seed filtration, evaporation, product filtration, and roasting.

Each workshop has an engineering station EWS and 2-3 operator stations OPS.

The data collection, real-time monitoring, data processing and other information transmission of the internal process parameters of the workshop are realized by the EtherNet/IP control network.

The main production operations of the entire alumina plant are completed by these eight subsystems, each controlled by a ControlLogix controller.

 

The information layer of the integrated process control system uses EtherNet/IP Industrial Ethernet.

Transfer the information of the above eight workshops to the whole plant production information dispatching center via Ethernet.

The center has two servers SERVER1, SERVER2 and two operating stations OPS1, OPS2, using the factory machine SE Factory.

Centralized monitoring, control and management of the entire plant production process.

 

Contact Us

Email: miya@mvme.cn (CLICK)

QQ: 2851195450

Tel: 86-18020776792(CLICK)

Skype:miyazheng520(CLICK)

 

More Products 

SIEMENS6ES7212-1BB23-0XB0SIEMENS6ES7350-2AH00-0AE0
SIEMENS6AV6640-0AA00-0AX0SIEMENS6ES7332-8TF01-0AB0
SIEMENS6SE7028-0ES87-2DA1SIEMENS6ES7216-2AD23-0XB8
SIEMENS6ES7223-1PH22-0XA8SIEMENS6ES5470-8MA12
SIEMENS6ES7355-2SH00-0AE0SIEMENS6SL3210-1KE21-3AP1
SIEMENS6ES7331-1KF02-0AB0SIEMENS6ES7 505-0KA00-0AB0
SIEMENS6SE7090-0XX84-0FF5SIEMENS6SL3210-1KE17-5AP1
SIEMENS6ES7157-0AC83-0XA0SIEMENS6SL3210-1KE15-8AP2
SIEMENS6AV6642-0DA01-1AX1SIEMENS6ES7 521-1BL00-0AB0
SIEMENS6SE7090-0XX84-0BJ0SIEMENS6SL3210-1KE22-6AP1

 

SERVICE

Condition: new and original

Warranty: 12 months

Delivery time: 2-3 days

Shipment: DHL/TNT/UPS/EMS/Fedex

Payment: T/T

Hot Products

6SC9731-0AL1 Siemens One Year Warranty PLC Module ⇒ Click here for good price 6SC9731-0AL1 Brand...
6SC9830-0BB52 Siemens Simodrive Anpassbaugruppe ⇒ Click here for good price GE.462000.0022.01 Brand...
6DM1001-4WB11-0 E89110-B2230-L1 Siemens Industrial Control System ⇒ Click here for good price ...
C98043-A1204-L C98040-A1204-P1-03-85 Siemens Replacement Motherboard ⇒ Click here for good price ...
E89110-B1891-L1 6RA2216-8DK27-0 Siemens Simoreg Combi Boiler ⇒ Click here for good price E89110...
C98043-A1235-L21 Siemens Power Supply ⇒ Click here for good price C98043-A1235-L21 Brand/Manufacture...