Home Companies Guangdong MEI-AL Technology Co., Ltd.

800T / Month Anodizing Production Line Manual Racking System

Guangdong MEI-AL Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No. 1, Changgang North Road, Changhongling Industrial Park, Shishan Town, Nanhai City, Foshan City

Contact name:Qi

Inquir Now

Guangdong MEI-AL Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

800T / Month Anodizing Production Line Manual Racking System

Country/Region china
City & Province foshan
Categories Glove Making Machinery Parts
InquireNow

Product Details

800T/month Manual Anodizing Production Line

 

 

一. Equipment Name: 

        Name: Control Horizontal Anodiding line

           Output: 800T/Month

 

二.Equipment Specifications :

       1. Model: Horizontal U mode.

 

       2. Operation method:   Semiautomatic or Automatic

 

       3. Racking method: Manual racking system

 

三. Design Condition

  1. Alloy : Aluminium 6061 to 6063 or others
  2. Anodizing film thinkness:The desired anodizing film thickness ranges from 10 to 12µm (microns).
  3. Average coverage area: The average coverage area is 400m² per ton of aluminum profiles.
  4. Max aluminium profile length:6500mm
  5. Extrusion ratio : 2.5kg/m²
  6. Working hour/m: 300d/m x 20h/d = 600h/m
  7.  Racking system: Two fixtures /rack
  8. Racking operation : Manual
  9. Equipment Usage Rate: 0.9
  10. Power supply : AC 3phase 380v 50hz
  11. Control Power : AC220V 50Hz
  12. Water supply : 2kg/cm²·G
  13. Hot steam : 6kg/cm²·G
  14. Compressor air : 6kg/cm²·G

四, Process Tank

  1. Degreasing 【Free sulfuric acid 180±30 g/l】                                                            1 Tank
  2. Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】                                       2 Tanks
  3. NeutralizationFree sulfuric acid180±20g/l】                                                    1 Tank
  4. Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】                                          4 Tanks
  5.  Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】          2 Tanks
  6. Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 1 Tank 

五, Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2.  Alkaline Etching 
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3.  Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min           
  4.  Anodizing
    (1) 2 jig(rack)/tank x 4tanks = 8jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 30min
    (4) Unprocess time: 10min
    (5) Total time 30+10=40min
          

          (6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

  1.  Colour 1

                     1) Clour process: Mix Salts

                     2) Quantity:2 jig(rack)/tank x 1tanks = 2jig(rack)

                     3) Current density: 70A

                     4) Process time: 2-8min

 

      6. Sealing
           1) Sealing menthod:  Sealing at Medium or Normal Temperature
           2) 
Quantity:6jig(rack)/tank x 1 tank
           3) Process time 10-15min

 

六. Design Parameter and Setting

       1. Anodizing treatment area:
              1) Each anodizing process tank need 40min ,where total jig(rack)/year:

                   ( 2 rack x 4 tank x 60min/h) ÷40min x600 hour =7200jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3) 
Area treatment/year : 7200jig(rack)x 50m² /jig =360000m²

 

2. Anodizing treatment weight:
        Monthly output : 360000m²÷400m²/T*0.9=810T≧800T

 

3. Power consumption:
        1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

           Power Rectifier : 15000A =4unit
        2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

   Colour Rectifier : 8000A =2 unit 

 

七. Process Chat

Discription for Un

1) De = Degreasing 

2) Rs = Rinsing,  HW Rs = Hot Water Rinsing 

4) AE = Alkaline Etching  

5) Ne = Neutralization

6)  An = Anodizing

7) Cl = Coloring 

8) Sl = Sealing 

9)  MU = Material Unloading 

10) Pc = Packing 

 

 

 

 

 

Hot Products

1500T/month Anodizing Production Line with silver color 8-12µm 一.Description Equipment Name Control ...
800T/month Manual Anodizing Production Line 一. Equipment Name: Name: Control Horizontal Anodiding ...
750 tons per month Horizontal Manual Anodizing Production Line 一. Equipment Name: 1 Name Control ...
1000 T/month Manual Anodizing Production Line 8000*width*3500 二. Design Condition 1 Alloy Aluminium ...
2500T/month Manual Oxidation Production Line 8000*width*3500 一. Name: 1 Name Control Horizontal ...
600T/month Manual Anodizing Production Line 600 T/Month Horizontal U Modeoxidation Production Line 8...