950T/Month Manual Horizontal oxidation Line Equipment 8000*width*3500

Guangdong MEI-AL Technology Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: No. 1, Changgang North Road, Changhongling Industrial Park, Shishan Town, Nanhai City, Foshan City

Contact name:Qi

Inquir Now

Guangdong MEI-AL Technology Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

950T/Month Manual Horizontal oxidation Line Equipment 8000*width*3500

Country/Region china
City & Province foshan
Categories Home Textile Product Machinery
InquireNow

Product Details

950T/Month Manual Horizontal oxidation Line Equipment 8000*width*3500

 

 

一. Equipment Name

1NameControl Horizontal Anodiding line
2Output950T/Month
3ModelHorizontal U mode
4Operation styleSemiautomatic or Automatic
5Racking methodManual racking system

 

二. Design Condition

1AlloyAluminium 6061 to 6063 or others
2Anodizing film thinkness10~ 12µm micron
3Average coverage area400m²/T (ton)
4Max aluminium profile length6500mm
5Extrusion ratio2.5kg/m²
6Working hour/m300d/m x 20h/d = 600h/m
7Racking systemThree fixtures /rack
8Racking operationManual
9Equipment Usage Rate0.9
10Power supplyAC 3phase 380v 50hz
11Control PowerAC220V 50Hz
12Water supply2kg/cm²·G
13Hot steam6kg/cm²·G
14Compressor air6kg/cm²·G

 

三. Process Tank

1Degreasing 【Free sulfuric acid 180±30 g/l】1 Tank
2Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】2 Tanks
3NeutralizationFree sulfuric acid180±20g/l】1 Tank
4Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】3Tanks
5Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】1 Tank
6Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】1 Tank

四.Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2.  Alkaline Etching 
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3.  Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min           
  4.  Anodizing
    (1) 3 jig(rack)/tank x 3tanks = 9jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 28min
    (4) Unprocess time: 10min
    (5) Total time 28+10=38min
          

          (6) Average anodizing layer : 0.36*1.3*28*0.77 =10.1um

  1.  Colour 1

                     1) Clour process: Mix Salts

                     2) Quantity:3 jig(rack)/tank x 1tanks = 3jig(rack)

                     3) Current density: 70A

                     4) Process time: 2-8min

 

      6. Sealing
           1) Sealing menthod:  Sealing at Medium or Normal Temperature
           2) 
Quantity:6jig(rack)/tank x 1 tank
           3) Process time 10-15min

 

五. Design Parameter and Setting

       1. Anodizing treatment area:
              1) Each anodizing process tank need 38min ,where total jig(rack)/year:

                   ( 3 rack x 3 tank x 60min/h) ÷38min x600 hour =8526jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3) Area treatment/year :
8526jig(rack)x 50m² /jig =426300m²

 

2. Anodizing treatment weight:
        Monthly output : 426300m²÷400m²/T*0.9=959T≧950T

 

3. Power consumption:
        1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

           Power Rectifier : 15000A =3unit
        2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

   Colour Rectifier : 8000A =1 unit 

 

六. Process Chat

 

Discription for Un
1DeDegreasing
2RsRinsing,
3HW RsHot Water Rinsing
4AEAlkaline Etching
5NeNeutralization
6AnAnodizing
7ClColoring
8SlSealing
9MUMaterial Unloading
10PcPacking

 

 

 

 

Hot Products

1500T/month Anodizing Production Line with silver color 8-12µm 一.Description Equipment Name Control ...
1500T/month Manual Anodizing Production Line Design Parameter 一. Equipment Name: Name: Control ...
200T/month Manual Anodizing Production Line Design Parameter 一. Equipment Name: Name: Control ...
950T/Month Manual Horizontal oxidation Line Equipment 8000*width*3500 一. Equipment Name 1 Name ...
900T/Month Manual Anodizing Production Line Design Parameter 一. Equipment Name: Name: Control ...
3000T/month Manual Anodizing Production Line Design Parameter 一. Equipment Name: Name: Control ...