Home Companies Foshan ABD Equipment Co., Ltd.

Electrostatic automatic vertical Powder Coating Line/Systems with spray pretreatment

Foshan ABD Equipment Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: F5-2 ,North Fanhu District ,Leping Central Sanshui Foshan City ,Guangdong Province ,China

Contact name:Cindy

Inquir Now

Foshan ABD Equipment Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Electrostatic automatic vertical Powder Coating Line/Systems with spray pretreatment

Country/Region china
City & Province foshan guangdong
Categories Home Product Making Machinery Parts
InquireNow

Product Details

 ABD PLC Control System Full-Automated Powder Coating Production Line Environmental Protection

Equipment features

Vertical Extrusion Aluminium Profile Powder Coating Production Line

*Full automatic control:Operation from the upload of original hanging profile to the download of finished coating profiles is completely automatic controlled.

*High productivity :As the requirement of customer,1000T/月---2500T/月

*Small area occupation:The occupied area of a 2000T/M coating line is W20m×L53m only.

*Low energy consumption :The square shape design of curing oven ensures the extreme high usage ratio of heat energy.

Save manpower:Automatic control ,reduce the manpower cost.

*Saving powder consumption:High efficiency for primary powder coating.Film thickness of workpieces is uniform,saving 15%powder comparing with horizontal powder coating system.

 

Equipments quotation

The seller will send the technician to provide the suggestions and advices of the installation, but the buyer is responsible for the air ticket cost, accommodation, meals and USD 100 / per day for each technician. If it causes extra charges during virus period, like quarantine hotel, food, test, local transportation and other costs, should be covered by the buyer.

 

The installation date of machine should be friendly discussed by the Buyer and the Seller.

 

Time: manufacture: 4 months. Installation and test: 2 months.

 

The valid date of this quotation is 3 months since provided.

 

Payment: 100% TT, at sight. (Within 14 days after the date of contract signature, 30% of the full contract amount should be released from the TT to the Seller’s beneficial account. When the shipment is ready, 65% of the full contract amount should be released from the TT to the Seller’s beneficial account. Within 30 days after the machine is installed and commissioned, 5% of the full contract amount should be released from the TT to the Seller’s beneficial account.)

About Us

 

1. We have been producing powder coating products for more than 9 years, and we have exported to more than 40 nations.

2. Before you make the balance payment, we will perform the pre-installation, as shown in the illustration below. You can organize the payment in a more secure manner in this manner. Additionally, by being aware of the equipment's installation procedures before it arrives, you will find it much easier to complete the installation.

3.We have a skilled sales team and an engineering team to provide excellent after-sales service.
4. Since we have a manufacturing of our own, we may create a design specifically for your situation.
5. If you would like to come for a visit, we would be happy to show you our actual projects. We have completed numerous manual and automatic powder coating projects in our city.
6. As for installation, we've already made the pre-installation if you don't want to do it yourself. Then you can decide which of our engineers you want to send to your city to help your citizens install the equipment. Unless you want our engineer to leave.

 

FAQ

Q1:Are you manufacturer?

A1:Yes, we are manufacturer, and have more than 10 years experienced engineer teams to design your projects and we welcome you to visit our factory in person.
 
Q2: Do you provide abroad install service and debug?
A2:Yes.
 
Q3: Do you provide installing video and installing instruction
A3: Yes. we will provide 3D installing drawing and instruction and video available too
 
Q4: Do you preassemble before delivery?
A4: Yes. each order must be finished in preassemble and approved test, then permit to pack and deliver, leave factory for client place
 

 

 

 

 

 

 

Hot Products

Vertical Anodizing Pruduction line of Aluminium Profiles Surface Pretreatment 2024 Popular Machine ...
ABD CE Certification Full-Automatic Vertical Powder Coating Production Line Auto-Matic Control ...
Aluminum Profile Vertical Spray Automatic Powder Spraying Coating Line SUS Metal PP Spray Booth ...
Project specifications ABD CE Certification Compact Full-Automatic Vertical Powder Coating Line This ...
ABD PLC Control System Full-Automated Powder Coating Production Line Environmental Protection ...
Project specifications This proposal is designed for aluminum profiles vertical powder coating line...