Shaanxi Zhongtuo Mine Equipment Co.,Ltd |
Verified Suppliers
|
|
Model specifications | Nominal tensile force (KN) | Nominal oil pressure (Mpa) | Through-hole diameter (mm) | Install limit plate aperture (mm) | Mounting tool (mm) | Outside diameter size (mm) Diameter * Height |
YDC650 | 650 | 48 | 72 | 99 | 95 | 200*385 |
YDC1000 | 1000 | 50 | 78 | 111 | 111 | 230*385 |
YDC1500 | 1500 | 52 | 94 | 150 | 150 | 270*390 |
YDC2000 | 2000 | 53 | 118 | 177 | 177 | 320*400 |
YDC2500 | 2500 | 52 | 128 | 210 | 185 | 345*400 |
YDC3000 | 3000 | 52 | 135 | 190 | 185 | 370*400 |
YDC3500 | 3500 | 51 | 160 | 232 | 232 | 420*400 |
YDC4000 | 4000 | 52 | 165 | 252 | 252 | 450*410 |
YDC5000 | 5000 | 52 | 196 | 260 | 265 | 500*410 |
YDC6500 | 6500 | 53 | 220 | 295 | 235 | 580*420 |
YDC10000 | 10000 | 50 | 270 | 440 | 415 | 740*570 |
Advantages of Post-Tension Jack
1. Mainly used for overall tensioning of group anchors.
2. The Multi PC Strand Jack is easy to operate, reliable in performance, and saves steel strands to the greatest extent.
3. The Multi PC Strand Jack is mainly used in the construction of bridges and other projects in conjunction with products such as prestressed anchors and tensioning equipment.
Installation of Post-Tension Jack and Anchorage
1. The steel strand shall be threaded into the reserved gallery of the structure, and the exposed length of the steel strand at the tensioning end is required to be 200-250mm longer than the working length of the jack. The steel strand must be cut with a thin disc grinder without loose ends or "rough ends" to avoid difficult perforation.
2. Cover the end of the steel wire bundle of the working anchor plate, push it to the anchor base plate, and align it with the spigot.
3. Installation of working anchor clips: before installing clips, use steel rings to clamp each pair of clips together, then push them into the taper hole of the anchor plate along the steel strand, and then push them until they do not move.
4. Installation of limit plate: the limit plate is designed according to the working anchor plate and matched with the hole of the anchor plate.
5. Installation of jack: first bind the end of the steel strand bundle with a wire pin, then lift the jack and put it on the steel strand, and put the support opening of the front cover of the jack on the outside of the limit plate. At this time, the jack can be coaxially aligned.
6. Install the tool anchor on the support lip at the end of the piston.
Application fields and precautions of Post-Tension Jack
Tensioning jacks are often used in the construction of bridges,
railways, highways, and other projects. There are several
precautions when using them, as shown below:
1. The tensioning jack shall be calibrated with the oil gauge
during the prestressed tensioning construction.
2. The prestress tensioning equipment and prestress stagger shall
be used according to the jack model in the stagger specification.
3. Before using the jack, it must be timely calibrated by the legal
metrological technical organization authorized by the competent
department according to the requirements to determine the
correction coefficient of the jack, oil pump, and oil pressure
gauge. During tensioning, the jack must be installed and used in
strict accordance with the oil pump number, oil gauge number, and
jack number indicated on the calibration report.
4. Before tensioning, the corresponding value between the oil gauge
reading and the tensioning force shall be calculated according to
the correction factor formula. Re-calibration shall be conducted
under the following conditions: before the first use of the new
jack; When the pointer of the oil pressure gauge cannot return to
zero, the jack, oil pressure gauge, and oil pipe have been replaced
or repaired; When the jack is used for more than 6 months or
tensioned for more than 200 times; Other abnormal phenomena occur
during use.
5. When using the jack, pay attention to the stability during
lifting. After lifting the heavy object slightly, check whether
there is any abnormal condition. If there is no abnormal condition,
continue to lift the jack.
6. When several jacks are working at the same time, it is necessary
to have a specially assigned person to command, so that the lifting
or lowering can be carried out synchronously. Wood blocks shall be
supported between two adjacent jacks to ensure spacing to prevent
sliding.