Home Companies Ruixin Energy Equipmnet

Anti Rust FWG Plugs Wireline Lock Mandrel Wear Resistant

Ruixin Energy Equipmnet

Contact Us

[China] country

Trade Verify

Address: Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province

Contact name:Selina Qiang

Inquir Now

Ruixin Energy Equipmnet

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Anti Rust FWG Plugs Wireline Lock Mandrel Wear Resistant

Country/Region china
City & Province baoji Shaanxi
Categories Cable Glands
InquireNow

Product Details

Anti Rust FWG Plugs Wireline Lock Mandrel Wear Resistant

 

Wireline Lock Mandrel FWG plugs

Wireline Lock Mandrel FWG plugs Bypass Blanking Plugs with Removable Mandrels are positive blank-off services designed

to seal off pressure from above and below. Wireline Lock Mandrel FWG plugs Blanking Plugs are equipped for Bottom No-Go

landing in Model “R” NonPorting Seating Nipples. The plugs are compatible with normal wireline equipment and procedures

Product description:

 

 Size  Lock cylinder salvage diameter  Balance bar fishing neck Balance bar fishing tool
1.875"2"1.375"2"SB
2.313"2.5"1.375"2"SB
2.813"3"1.375"2"SB
3.813"4"3.125"4"SB


Running of the plug:

1. firstly, connect the valve cap to the X/XN lock cylinder up and down to the preset working cylinder;

2. Connect the balance bar to the SB fishing tool and run down the well;

3. Lower it slowly after reaching the depth to be dropped, so that the P-type balance bar can enter the sealing hole of the bonnet;

4. Shook down slightly to make the P-type balance bar reach its position;

5. Shook down to cut off the shear pin of the running SB fishing tool;

6. Trip out and run the tool. At this time, the P-type balance bar remains in the well to complete the plugging. Note: Before running in the well, check whether the seal is intact.

 Salvage of plugs:

1. run SB-type fishing tool to fish out p-type balance bar first;

2. Run GR fishing tool to fish X/XN lock cylinder.

matters needing attention:

1. Replace the seal before running in the well;

2. If there are burrs or bites on the outside, it should be repaired with a file in time.

 

Welcome to contact us at any time

Hot Products

Simple steel wire Simple Blowout Prevention System I. Overview: Simple steel wire surface blowout ...
Wellhead Flange Wireline Pressure Control Equipment Alloy Steel Wireline Wellhead Flange Wireline ...
Quick Union Wireline Lubricator Hydraulic Pressure Control I. Introduction Wireline Lubricator ...
Blowout Preventer BOP Wireline Pressure Control Equipment Blow out Preventer (BOP), which is ...
Wellhead Flange Wireline Pressure Control Equipment Alloy Steel Wireline Wellhead Flange Wireline ...
Wellhead Joint Wireline Pressure Control Equipment Alloy Steel Wireline Wellhead Joint Wireline ...