Home Companies Ruixin Energy Equipmnet

10K Wireline Tee Joint Wireline Pressure Control Equipment 2" - 7"

Ruixin Energy Equipmnet

Contact Us

[China] country

Trade Verify

Address: Room 1901, Block A, Saigao District Building, Feng Cheng Five Road, Xi 'an Economic and Technological Development Zone, Shaanxi Province

Contact name:Selina Qiang

Inquir Now

Ruixin Energy Equipmnet

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

10K Wireline Tee Joint Wireline Pressure Control Equipment 2" - 7"

Country/Region china
City & Province baoji Shaanxi
Categories Gasoline Powered Tools
InquireNow

Product Details

10K Wireline Tee joint Wireline Pressure Control Equipment 

 

Ⅰ. Introduction
The Wireline
Tee joint is attached below the BOP,The Wireline Pumping tee connection thread is used to connect the wellhead manifold to provide a path for large flow. NPT thread hole on the other side of the tee body is a pressure release valve . After installing the pressure
release valve, it can be used for pressure relief to ensure safe operation.

II. General Technical Parameters
                                                  

Bore

Work Pressure

Service

Connection

PN

2.5"

5K 10K

Std H2S

5"-4ACME

S0*-0*.0*.00

3"

5K

H2S

5"-4ACME

S0*-0*.0*.00

3"

10K

Std

5"-4ACME

S0*-0*.0*.00

3"

10K

Std H2S

5-3/4"-4ACME

S0*-0*.0*.00

2.5"

15K

H2S

5-3/4"-4ACME

S0*-0*.0*.00

4"

5K 10K

Std

6-1/2"-4ACME

S0*-0*.0*.00

3"

15K

Std H2S

7-1/2"-4ACME

S0*-0*.0*.00

5"

5K

Std H2S

8-1/4"-4ACME

S0*-0*.0*.00

4"

10K

Std H2S

8-3/8"-4ACME

S0*-0*.0*.00

5"

5K 10K

Std H2S

9"-4ACME

S0*-0*.0*.00

4"

15K

Std H2S

9-1/2"-4ACME

S0*-0*.0*.00

6.38"

10K

Std H2S

11-1/2"-4ACME

S0*-0*.0*.00

                                                       

Ⅲ. Pressure Testing:
1. Install the pressure test connector and connect the pressure test line;
2. Start the pressure test pump to carry out the pressure test. Refer to the specific specifications and drawings for the test pressure and time. Fill in the test record card.

Ⅳ. Daily Maintenance
1.After use, the O-ring and seal should be replaced;
2.When not in use, should take the protector and brush the thread with anti-rust oil for storage.
Welcome to contact us at any time.

Hot Products

Pump-In-Tee Wireline Pressure Control Equipment Ⅰ.Introduction The Pump in tee is attached below the ...
10K Wireline Tee joint Wireline Pressure Control Equipment Ⅰ. Introduction The Wireline Tee joint is ...
20 inch Cable Sky Pulley Wellhead Wireline Pressure Control I. Overview: The Cable sky pulley is ...
Wireline Wellhead Joint Wireline Pressure Control Equipment I. Overview: The wellhead joint is used ...
Wellhead Adapter Wireline Pressure Control Equipment Nickel Alloy Material I. Overview The Wellhead ...
Wellhead Joint Wireline Pressure Control Equipment I. Overview The wellhead joint is used to connect ...