Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Exploration Wheels Mounted Gk 200 Crawler Mounted Drill Rig Durable Strong

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Exploration Wheels Mounted Gk 200 Crawler Mounted Drill Rig Durable Strong

Country/Region china
City & Province jinzhou hebei
Categories Glass Product Making Machinery
InquireNow

Product Details

Wheels Mounted GK 200 Durable Strong Crawler Mounted Drill Rig

 

 

GK 200 Crawler Mounted Drill Rig Introduction

 

The drilling rig is applicable to the engineering geological survey of industrial and civil construction, railway, hydropower, transportation, bridge, dam foundation and other buildings; Geological core drilling and physical investigation; Drilling of small grouting holes, geothermal holes, blasting holes and various concrete detection holes; Small water well drilling and small foundation pile hole.

 

GK 200 Crawler Mounted Drill Rig Tech Information

 

Drilling depth
200m
Maximum open hole caliber300mm
End hole caliber75mm
Drill rod caliber60mm
Drilling angle90°~75°
Drill weight (No include power)975kg
Unity machine dimensions1433×697×1273m
Spindle
spindle speed64 128 287 557r/min
Spindle stroke450mm
Winch
Max.single line hoisting capacity2400kg
Single line lifting speed0.41,0.82,1.64m/s
steel wire rope caliber13m(35m)
Mud pump
TypeHorizontal single urn twin-action
Displacement
170/150L/min(diesel or electromotor)
Diesle engineZS1115 16.2kw 2200r/min
Electric motorY160M—4 11kw 1440r/min

 

GK 200 Crawler Mounted Drill Rig Features

 

1) It has a hydraulic feeding structure to improve the drilling efficiency and reduce the labor intensity of workers.

(2) The drilling rig is equipped with upper ball clamp clamping mechanism and hexagonal active drill pipe, which can reverse the rod without shutdown and is easy to operate.

(3) It is equipped with a hole bottom pressure gauge to indicate the pressure, which is convenient to master the situation in the hole.

(4) The handle is centralized and easy to operate.

(5) The base is equipped with an oil cylinder, which can move back and forth for easy lifting and lowering of drilling tools

(6) The drilling rig has the advantages of compact structure, small volume, light weight, strong decomposition and easy relocation. The loading form is trailer type, crawler type and disassembly. It is suitable for working in plain or mountainous areas.

 

GK 200 Crawler Mounted Drill Rig Application

 

1.1 Engineering geological investigation of railways, hydropower, traffic, bridges, dam foundations and other buildings.

1.2 Geological core drilling, physical prospecting.

1.3 Small grout Confucius, drill hole drilling.

1.4 Small well drilling.

 

Soil Sampling Best Time and procedure

 

Soil samples can be taken any time throughout the year. It is important though to sample approximately the same time of the year. Late summer, or early fall, is a good time for most crops. This allows time for lime recommended to react and change the pH before the crop is planted

The specific steps of soil sampling method are as follows:

1. Distribution: samples shall be taken according to the soil type and the distribution of crop varieties, and according to the different soil fertility. The sampling points are distributed in zigzag or snake shape, which should be as uniform and random as possible.

2. Determine the sampling position and depth: the sampling position and depth shall be determined according to the thickness of the cultivated layer. Generally, the sampling depth is 0-20cm

Divide the field into different homogeneous units based on the visual observation and farmer’s experience.

Remove the surface litter at the sampling spot.

Drive the auger to a plough depth of 15 cm and draw the soil sample.

Collect at least 10 to 15 samples from each sampling unit and place in a bucket or tray.

If auger is not available, make a ‘V’ shaped cut to a depth of 15 cm in the sampling spot using spade.

Remove thick slices of soil from top to bottom of exposed face of the ‘V’ shaped cut and place in a clean container.


 


 
 
 
 

Hot Products

St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 ST 200 Water Well Drilling ...
Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...
Borehole Blasting 400 Meters Depth Water Well Drilling Machine with Customized Diameter​ ST400 Water ...
180 Meters Water Well Drilling Rig Industrial Deep Borehole Rock Stone Blasting ST 180 Water Well ...