Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Rubber Crawler Mounted Pneumatic Drilling Rig For Agriculture Irrigation 180m Water Borehole Drilling

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Rubber Crawler Mounted Pneumatic Drilling Rig For Agriculture Irrigation 180m Water Borehole Drilling

Country/Region china
City & Province jinzhou hebei
Categories Rubber Product Making Machinery Parts
InquireNow

Product Details

St 180 Rubber Crawler Mounted Pneumatic Drilling Rig

 

 

 ST 180 Pneumatic Drilling Rig Description

 

ST 180 Pneumatic water well borehole drilling rig has fast drilling speed . pneumatic dth drilling rig can drill 20-40m per hour ,high drilling effective .the engine it is 63kw ,more powerful ,it is applicable to the engineering geological survey of industrial and civil construction, railway, hydropower, transportation, bridge, dam foundation and other buildings

 
ST 180 Pneumatic Drilling Rig Tech Data

 

ST 180 Pneumatic Drilling Rig
Item NO.ST-180Air consumption(m³/min)17-31
The Weight(T)4.5Equipped capacitor(Kw)55
Dimensions(mm)3800*1550*2350Swing speed(rpm)45-65
The hole diameter(mm)140-254
Swing torque(N.m)
3200-4600
Drilling Depth(m)180Drill pipe diameter(mm)76 89
Once-time advance length(m)3.3Drill pipe length(m)1.5 2.0 3.0
Walking speed(Km/h)2.5Rig lifting force(T)10
Climbing angles(Max.)30sopporting Power29m3/min 23BAR AIR COMPRESSOR
Using air pressure(Mpa)1.7-2.5  

 

ST 180 Pneumatic Drilling Rig Advantages

 

1) With oil pressure automatic feeding mechanism, the drilling efficiency is improved and the manual labor intensity of workers is reduced.

(2) The ball clamp clamping mechanism is used to replace the chuck, and the clamping positioning mechanism is equipped to implement the rod reversing without stopping the machine.

(3) It is equipped with a pressure gauge at the bottom of the hole to indicate the pressure, so as to grasp the situation in the hole.

(4) The handle is centralized and easy to operate.

(5) The structure is compact, the drilling rig and the power machine are all installed on the same base, and the occupied area is small.

(6) Light weight, strong decomposability, easy to move, suitable for plain or mountain work.

(7) It is equipped with a safety shield, which highlights the humanized design characteristics of the equipment.

(8) Fixed nuts are installed at the connection between the lower end of the feed cylinder and the vertical shaft box, which improves the reliability of the drill.

 

Courtyard Drilling

 

1. Consider whether the well depth is reasonable

We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.

2. Convenience, health and other issues should be considered.

After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.

3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.

 
Large Pneumatic Drilling Rig FAQ

 

Q 1: What kind of drilling rig do you have?

A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .

Q 2: Where is the address of your company?

A: Our factory is in Jinzhou, Shijiazhuang City, Hebei Province, China

Q 3: Are you a manufacturer or a trading company?

A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.

Q 4: How long is your delivery time?

A: Small hydraulic drilling rigs generally take 5-7 days, and large pneumatic water well drilling rigs generally take 7-15 days. If there is an urgent order, please contact our sales in advance.

Q 5: How long is the warranty of your well drilling rig?

A: Except for consumable spare parts, the whole machine shall be one year.

Q6: How long can your air compressor be used?

A: Normally more than 10 years.

Q 7: What are the terms of payment?

A: TT, Western Union transfer.

 




 
 
 

 
 
 
 
 

Hot Products

ST 180 Portable Fast Speed Farming Water Well Drilling Rig ST 180 Water Well Drilling Rig Decription ...
Crawler Drilling Rig For Water Well Drilling Rig Machine Driven By Diesel Engine Introduction of 200 ...
St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 ST 200 Water Well Drilling ...
Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...