Jinzhou City Shitan Machinery Equipment CO. LTD. |
Verified Suppliers
|
|
High Outriggers DTH Rocky 350 Meters Pneumatic Borehole Drilling Rig
ST 350 Pneumatic Drilling Rig Description
ST 350 large pneumatic water well drilling rig is a high
working efficiency drilling machine, water conservancy
drilling industry, to help you solve the problem of drilling at
high efficiency and low cost,the theory designed drilling depth is 350 meters and it is also
equipped with a high-standard air compressor, which is an
integrated design of a standard air compressor and a drilling rig,
with strong power and more convenient movement.
ST 350 Pneumatic Drilling Rig Tech Details
Product Name | ST 350 Pneumatic Drilling Rig |
Power Type | Diesel |
Place of Origin | China |
Brand Name | SHITAN |
Usage | Ore |
Dimension(L*W*H) | 6400MM*2250MM*2700MM |
Weight Of Machine | 8.9 T |
Certification | ISO9000 |
Warranty Time | 12 Months |
Marketing Type | New Product 2020 |
Drilling diameter | 152mm-305mm |
Depth | 25M |
Rotary speed | 0-90rpm |
DTH | K40 |
Drilling Rods | 76*2m+76*3m |
Air consumption | 13-20m3/min |
Travelling speed | 0-2.5km/h |
ST 350 Pneumatic Drilling Rig Features
It is suitable for industrial and civil drilling and geothermal
drilling. It has the advantages of large drilling diameter, deep
drilling, fast footage, flexibility, etcCrawler pneumatic drilling
rig, mechanical walking, with high base gear, can cross uneven
terrain by itself, and can load and unload vehicles automatically,
saving hoisting expenses! Small size, automatic hydraulic system,
safe and reliable!
ST 350 Pneumatic Drilling Rig Packing
1.Water well drilling rig is firmly fixed with steel wire ropes to
ensure the safety and no damage of the cargo during transportation.
Attention During Operation
During the drilling operation, it should be noted that the water output requirements of different wells are different. At this time, there are differences in the well hole structure design, well depth and well diameter. It is very important to design according to the actual needs, so as to make the operation more satisfactory. Therefore, in terms of drilling operation, it should also be noted that it is also very important to be able to make adjustments in the layout and placement of various equipment.