Home Companies Jinzhou City Shitan Machinery Equipment CO. LTD.

Rubber Crawler Mounted Pneumatic Drilling Rig 180 Meters Depth

Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Us

[China] country

Trade Verify

Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China

Contact name:Anna

Inquir Now

Jinzhou City Shitan Machinery Equipment CO. LTD.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Rubber Crawler Mounted Pneumatic Drilling Rig 180 Meters Depth

Country/Region china
City & Province jinzhou hebei
InquireNow

Product Details

Rubber Crawler Mounted 180 Meters Depth Pneumatic Drilling Rig

 

 

ST 180 Pneumatic Drilling Rig Introduction

 

ST 180 Pneumatic drilling rig machine mainly drilling rock must connect with air compressor . it has fast drilling speed . pneumatic dth drilling rig can drill 20-40m per hour . high drilling effective .the engine it is 63kw ,more powerful .
 
ST 180 Pneumatic Drilling Rig Tech Data

 

ST 180 Pneumatic Drilling Rig
Item NO.ST-180Air consumption(m³/min)17-31
The Weight(T)4.5Equipped capacitor(Kw)55
Dimensions(mm)3800*1550*2350Swing speed(rpm)45-65
The hole diameter(mm)140-254
Swing torque(N.m)
3200-4600
Drilling Depth(m)180Drill pipe diameter(mm)76 89
Once-time advance length(m)3.3Drill pipe length(m)1.5 2.0 3.0
Walking speed(Km/h)2.5Rig lifting force(T)10
Climbing angles(Max.)30sopporting Power29m3/min 23BAR AIR COMPRESSOR
Using air pressure(Mpa)1.7-2.5  

 

ST 180 Pneumatic Drilling Rig Product Advantage

 

well drilling rig is a lightweight, efficient, versatile drilling hole equipment, which is mainly applied in drilling wells, irrigation wells, geothermal wells and air holes for other purposes, especially for mountain and rock formation water engineering. The well drilling rig machine can work on different formations, well drilling diameter up to 300mm,drilling depth 200m.
1.High drilling efficiency diesel engine
2.High efficiency(20M~40M/Hour), large rotary torque(6000-6500N.m)
3.Integrated automation equipment,All terrain moves by itself
4.Adopt consummate design, long service life
5.Self loading and unloading,easy to operating.
 
Operation of well drilling machine when adding drill pipe

 

1. When the depth of one drill pipe needs to be connected after drilling, stop the propulsion first, then stop the rotation,

2. Operate the clamping handle to make the gripper clamp the drill pipe and open the micro regulating flow valve (right rotation);

3. The rotator reverses, and at the same time, retracts the feed oil cylinder to rotate the water braid shaft away from the drill pipe;

4. Stop the rotation and operate the fast forward and backward handle to the fast backward position to make the chuck quickly return to place;

5. Connect the drill pipe to be added to the previous drill pipe, and the rotator moves forward while rotating. When the trapezoidal conical thread of the water braid shaft is in screw contact with the conical thread of the newly added drill pipe, immediately operate the gripper handle, loosen the gripper and complete the drill pipe addition.

 

Shitan Machinery Large Pneumatic Drilling Rig FAQ

 

Q 1: What kind of drilling rig do you have?

A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .

Q 2: Where is the address of your company?

A: Our factory is in Jinzhou, Shijiazhuang City, Hebei Province, China

Q 3: Are you a manufacturer or a trading company?

A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.

Q 4: How long is your delivery time?

A: Small hydraulic drilling rigs generally take 5-7 days, and large pneumatic water well drilling rigs generally take 7-15 days. If there is an urgent order, please contact our sales in advance.

Q 5: How long is the warranty of your well drilling rig?

A: Except for consumable spare parts, the whole machine shall be one year.

Q6: How long can your air compressor be used?

A: Normally more than 10 years.

Q 7: What are the terms of payment?

A: TT, Western Union transfer.


 



 
 
 
 

Hot Products

ST 180 Portable Fast Speed Farming Water Well Drilling Rig ST 180 Water Well Drilling Rig Decription ...
Crawler Drilling Rig For Water Well Drilling Rig Machine Driven By Diesel Engine Introduction of 200 ...
St 260 Meters Large Horse Power Yuchai Diesel Engine Customized Borehole Water Well Drilling Rig ...
Gy200 Investigation Prospecting 300 Meters Water Well Borehole Drilling Rig GY200 Water Well ...
Rocky Strata Deep Hard Stone 200 Meters Water Well Drilling Rig ST 200 ST 200 Water Well Drilling ...
Large Horsepower Rock Blasting ST 200 Water Well Borehole Drilling Rig ST 200 Water Well Drilling ...