1. A horizontal, triplex, single acting reciprocation piston pump.
The pump can choose diesel motor power, It has simple operation,
convenient, can achieve close range or remote control.
2. This pump is a compact structure, smooth operation, high output
pressure, longer life expectancy, stable performance, good
general and so on.
3. This pump adopts the car transmission,Can get six different
discharge and pressure,Reasonable configuration parameters
selection,The construction technology can satisfy different
requirements.
4. Mainly used drilling fluid in supply for 2000m about core
drilling coal field geology,metallurgy
geology,hydrogeololgy,drilling fluid can use mud and water, the
coal water etc.
Product Parameter:
Model | BW150 | BW160 | BW250 | BW320 | BW850 |
Max. flow | 150L/min | 160L/min | 250L/min | 320L/min | 850L/min |
Max. pressure | 7Mpa | 6Mpa | 6Mpa | 8Mpa | 8Mpa |
Power | 7.5kw | 11kw | 15kw | 30kw | 54KW |
Inlet pipe diameter | 51mm | 51mm | 76mm | 76mm | 152mm |
Outlet pipe diameter | 32mm | 32mm | 51mm | 51mm | 64mm |
Weight | 560kg | 480kg | 760kg | 1000kg | 3100kg |
BW Series Mud Pump Working Attentions
1. Before starting, the suction pipe, bottom valve and pump body
should be filled with water, and the upper end of the pressure
gauge buffer should be filled with oil.
2. Before starting, make the piston reciprocate twice, and start
with no load when there is no obstruction. After starting, the load
shall be increased gradually after the operation is normal.
3. During operation, the sand content of mud should be tested
frequently. The sand content of mud shall not exceed 10%.
6. For mud pump with multiple speeds, several speeds shall be
operated separately in each shift, and the operation time shall not
be less than 30min
4. Do not change speed during operation; When it is necessary to
change speed, stop the pump for shifting.
5. During operation, when there is abnormal noise, abnormal water
volume and pressure, or obvious temperature rise, the pump shall be
stopped for inspection.
6. Under normal conditions, the pump shall be stopped at no load.
When the pump is stopped for a long time, all drain holes should be
opened, the cylinder head should be loosened, the bottom valve
drain rod should be lifted, and all the mud and sand in the pump
body and pipeline should be drained.
7. In case of long-term shutdown, clean the mud and oil dirt of
each part, drain the lubricating oil in the crankcase, and take
anti-rust and anti-corrosion measures.