Home Companies Chengdu Yuanjin Environmental Engineering Co., Ltd.

Compact Hospital Wastewater Treatment Plant AO Process 200m3/D 380V

Chengdu Yuanjin Environmental Engineering Co., Ltd.

Contact Us

[China] country

Trade Verify

Address: Room 774, 7th Floor, Block C, Meinian Plaza, Tianfu New District, Chengdu City, Sichuan Province

Contact name:Jing

Inquir Now

Chengdu Yuanjin Environmental Engineering Co., Ltd.

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

Compact Hospital Wastewater Treatment Plant AO Process 200m3/D 380V

Country/Region china
City & Province chengdu sichuan
Categories Water Treatment
InquireNow

Product Details

Integrated Sewage Treatment Equipment Description

 

200m3/D Integrated Sewage Treatment Equipment For Mental Hospital Sewage

 

Introduce

 

Integrated Sewage Treatment Equipment adopting mature contact oxidation process (A/O), hypoxia and after aerobic process will be delivering in series with the segment in the anoxic period (A) heterotrophic bacteria will hydrolysis of soluble organic matter in water to organic acid, make the macromolecular organic matter is decomposed into small molecule organic compound, insoluble organic matter into soluble organic matter, The protein, fat and other pollutants are ammoniated (N on the organic chain or the amino group in the amino acid) free ammonia (NH 3, NH 4 +). In the aerobic segment (segment O) there are aerobic microorganisms and autotrophic bacteria (nitrifying bacteria), wherein aerobic microorganisms decompose organic matter into CO 2 and H 2 O; Under the condition of sufficient oxygen, nitrification autotrophic bacteria to NH 3 - N (NH 4 +) oxidation to NO 3 -, by circumfluence control returns to A pool, under the condition of hypoxia, heterotrophic bacteria denitrification will NO 3 - reduction for molecular nitrogen (N (2) complete C, N and O in the ecological cycle, realize the sewage disposal.

 

Application


Residential/village/market town/station/airport/harbour terminal/ship factory/tourist spot/earth warehouse/scenic area similar to other waste water

 

Advantages

1. save space, convenient infrastructure installation

 

It can be buried below the surface, and the surface above the equipment can be used as greening or other land to reduce the land area, and there is no need to build houses and heating and thermal insulation.

 

2. New technology, good decontamination effect, less sludge production and stable effluent water quality

 

The secondary biological contact oxidation treatment process adopts biological contact oxidation, and its treatment effect is better than that of fully mixed or two-stage series fully mixed biological contact oxidation tank. Smaller than the activated sludge tank, strong adaptability to water quality, good impact load resistance, water quality stability, no sludge expansion. Pool using new filler, large surface area, microorganisms easy to hang film, film removal, under the same organic load conditions, high removal rate of organic matter, can improve the oxygen solubility in the air in the water.

 

The biological contact oxidation method is adopted in the biochemical tank. The volume load of the packing is relatively low, the microorganisms are in their own oxidation stage break, and the sludge production is small. The sludge only needs to be discharged once every three months (90 days) or more (pumped or dehydrated into mud cake by a manure truck for external transport).

 

3. Good deodorization effect

 

This equipment is equipped with soil deodorization facilities. The modified soil and air pipe are arranged in the upper space of the reinforced concrete pool. When the odor is dissolved in the water contained in the soil through the soil layer, it is transferred to the soil due to the surface adsorption and chemical reaction, and finally decomposed by the microorganisms in the soil to achieve the purpose of deodorization.

 

PRODUCT DETAILS

 

 

 

 

SEWAGE CAN BE RECYCLED AFTER TREATMENT

 

 

ADAPT TO A VARIETY OF POLLUTION SOURCES

 

 

 

REAL SHOT DISPLAY

 

 

COMPANY REAL SHOW

 

 

Chengdu Yuanjin Environmental Protection Engineering Co., LTD. Since the establishment of the company, the series of water treatment products in Chengdu as the center radiation southwest region, facing the whole country, won many customers' praise.

 

Through the cooperation with international well-known companies in the field of water treatment, our company keeps pace with the international advanced level in water treatment technology; At the same time, the technical team of our company is composed of a group of people with long-term working experience in the field of water treatment. Some have worked in large enterprises for a long time, and some have worked in multinational companies for a long time. The field service engineers all have certain work experience; Advanced science and technology, professional service team, coupled with my company's long-term management, to provide our customers with quality service. The company is committed to the research and development of water treatment equipment for a long time, and the introduction of domestic advanced technology and experience, the pursuit of practical and continuous innovation. Yuan Jin environmental protection project will strive to create the most reputable Chengdu water treatment company. We always take "quality first, customer first" as the purpose, with "integrity, pragmatic, responsible, efficient" business policy.

 

While maintaining first-class product quality, we strive to improve quality and efficiency.

 

FAQ

 

1.Why choose us?

1) Yuanjin has 12 years of experience in wastewater and sludge treatment.

2) We introduce advanced technology and experience at home and abroad, and have been committed to the research and development of water treatment equipment for a long time.

3) We only use the best parts from the best suppliers.

​4) Yuanjin's technical team is composed of a group of people with long-term working experience in the field of water treatment to provide customers with high-quality services.

 

2. What is the price of the product?
According to the amount of water treated, the price is different, and the unit price range is 145~866 $/m3·d.


3. What is the effect of the treated water?
1) The treated pure water can be directly consumed and meets the World Health Organization (WHO) drinking water quality standards.
2) The sewage can be directly discharged after treatment, which is environmentally friendly and meets the requirements of international sewage treatment discharge standards.

 

 

Hot Products

Industrial Wastewater Treatment Equipment High Efficiency Industrial Wastewater Treatment Equipment ...
Industrial Wastewater Treatment Equipment 500m3/D AAO biochemical industrial wastewater treatment ...
MBR Wastewater Treatment Equipment 10m3/H Ceramic Tubular Membrane For Fruit Juice Concentrate In ...
MBR Wastewater Treatment Equipment 50m3/H Ceramic Tubular Membrane ForUpgrading Of Water Works ...
MBR Wastewater Treatment Equipment 120m3/H Ceramic Tubular Membrane For Lithium Extraction From Salt ...
MBR Wastewater Treatment Equipment 80m3/H Ceramic Tubular Membrane For Plant Extraction Equipment ...