Beijing Vibroflotation Engineering Machinery Limited Company |
Verified Suppliers
|
|
Powerful 180kW vibroflot equipment used for soil improvement BJV180E-377
The Top Feed Electric Vibroflot Spec. | ||||||||
Type | Power (kW) | Rated current(A) | Max rotation speed(rpm) | Max amplitude (mm) | Vibration power(kN) | Weight (kg) | Outer diameter(mm) | Length(mm) |
BJV130E-377 | 130 | 255 | 1450-1800 | 19 | 180-276 | 1900 | 377 | 3355 |
BJV150E-377 | 150 | 290 | 1450-1800 | 19 | 180-276 | 2100 | 377 | 3445 |
BJV180E-377 | 180 | 350 | 1450-1800 | 21 | 180-276 | 2140 | 377 | 3485 |
Vbroflotation techniques
Vibroflotation is one of a typical technique which is a widely used application for foundation soil improvement.
In vibroflotation construction, vibroflot equipment makes a joint action of horizontal vibration and high pressure water or air shock to compact the loose sand layer or formed in soft soil of gravel column to compose the composite foundation with original soil together, finally achieve the improvement of soil by load capacity, settlement controlling as well as the anti-seismic capacity.
Vibroflotation is often used in foundation treatment of dams, oil fields, power plants, ports, airports, bridges, etc.
Vibroflot manufacturer
1. The first one who introduced and studied vibro compact method in
China
2. The first one who developed application in Chinese projects
3. Has the top experts of vibroflotation tech. and experienced
construction management team
4. China first one who reserched and produced vibrators
5. China first and only one who produced the Bottom Feed Vibroflot
6.The first one who produced domestic hydraulic-driven vibrator
7. All types&models coverage:30kw-260kw
8. Editor-in-cheif of industry standards <Technical
Specification of Vibroflotation Method in Hydrauelectric and Water
Resources Projects>(DL/T5214-2005)
9. Editor-in chelf of industry standrds <Electrical Deep
Vibrator>(DL/T 1557-2016)
10. China first one who developed vibroflotation application in
variety of industry(thermal power,hydraulic power, petrochemical,
highway,rail, port etc.)
11. Cooperate with DI and support to formulate the design and
construction scheme