Home Companies CHANGZHOU UNITED WIN PACK CO.,LTD

UW-650×4 Four Shuttle Circular Loom Plastic Woven Bag Making Machine

CHANGZHOU UNITED WIN PACK CO.,LTD

Contact Us

[China] country

Trade Verify

Address: 16A-103, Jintong International Industrial Park, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China

Contact name:James

Inquir Now

CHANGZHOU UNITED WIN PACK CO.,LTD

Verified Suppliers
  • Trust
    Seal
  • Verified
    Supplier
  • Credit
    Check
  • Capability
    Assessment

UW-650×4 Four Shuttle Circular Loom Plastic Woven Bag Making Machine

Country/Region china
City & Province changzhou jiangsu
Categories Manufacturing & Processing Machinery Parts Processing Services
InquireNow

Product Details

UW-650×4 Four Shuttle Circular Loom Plastic Woven Bag Making Machine

 

 

Features:

 

1. Little cam type and convex table as well as swing-beam rolling wheel transmission is adopted, making it easy and stable to run.
2. Slide block and rod are eliminated while the wearing parts are decreased. Rolling transmission is adopted in entire structure, which doesn't need lubricant.
3. Frequency speed regulation which is convenient and stable is adopted.
4. It is configured with automatically stop detecting unit when meeting the situation of warp/weft breaking, weft ending. The stoppage unit is sensitive and reliable.

 

 

Specifications:

 

ItemUW-650×4UW-850X6HUW-1350×6UW-2200×6UW-2250×8
Number of shuttles(pcs)46668
Folding width of cloth(mm)150-650300-850900-13501500-22001750-2250
Number of warp576 pcs720pcs1200pcs2880pcs2880pcs
Weft density8-16(pcs/inch)
Max. speed(r/min)160150-1801108070
Power of main motor2.KW3kw5.5 KW7.5kw11kw
Max.weft Bobbin diameterФ 100Ф 115Ф 90
Overall dimension(L×W×H)8500×2500×290010500×2800×292010850×3000×350016480×3600×458016480×3600×4580
Weight (about)2000kg2500kg4200kg8000kg9000kg

 

 

Machine Photo:

 

 

 

FAQ:
 

1. How long will your engineer reach our factory?

Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?

We will finish installation and training within 30 days.

 

3. How long is your machine's warranty period?

All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.

 

4. How could you do if the parts broken within warranty?

We would express the free replacement parts during the warranty date

 

5. How could you do after one year warranty period?

We also can-do service for you, but you need pay salary for our technicians 150USD/day for each person.

 

6. How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time.

Our engineers will take a solution video according your description.

Hot Products

PP Flat Yarn Polystyrene Tape Extrusion Line for Plastic Woven Bag 140kg/h Descripition: UW-Z ...
High Speed Pp Flat Yarn Plastic Extrusion Machine Woven Bag Production Tape Line Descripition: UW-Z ...
Plastic Woven Bag Flat Wire Extrusion Machine PP Flat Yarn Polystyrene Extrusion Line Descripition: ...
Polypropylene Flat Yarn Tape Extrusion Machine Woven sack Production Line Descripition: UW-Z Plastic ...
PP PE Waste Film/ Plastic Bags Scrap Granulator Recycling Machine Description: Recycling and ...
Waste Plastic Crusher Plastic Scrap Grinder Recycling Plastic Bottle Crusher Machine Descripition: ...